The installation of top warehouse plate should be carried out alternately with the installation of wall plate, and the wall plate should leave a gap for withdrawing construction equipment; During the installation of the top warehouse plate, the end steel sheet at the overlap with the wall plate shall be disconnected for 50mm to prevent the cold bridge from running cold; Two layers of foaming materials shall be evenly and continuously punched on the joint surface between each top warehouse plate. Rivets shall be pulled and fixed at the internal and external lap joints of the steel plate, if there are supporting beams, columns and supporting steel frames in the warehouse, the setting out and positioning shall be carried out and accurate and clear marks shall be made according to the requirements of the design drawings; Weld or install the support beam, column, support steel frame, etc., and the welded junction shall be moisture-proof and treated according to the drawing requirements.

The polyurethane insulation board shall be connected by plug-in notch connection, because it has higher strength when connecting in this way.

Kampung Pasir Gudang Village.Pressure leak test: the system pressure leak test is the same as the blowdown work sample, which is required to be carried out by air compressor.

Immediate cooling is to install the condenser of the cold storage in the box or building of the cooling equipment, use the volatilization of the refrigerant to immediately cool the air in the air, and use the cold air to cool the objects that need to be cooled. This kind of refrigeration is characterized by faster cooling speed, small heat conduction temperature difference and simple system software, so it is widely used.

.Quick freezing storehouse is widely used. There are many kinds of temperature in quick freezing storehouse, and multi temperature or double temperature can be realized to meet the needs of different customers. Fault phenomena: unit current is large and voltage is too low; Loose wiring; The unit pressure exceeds the rated pressure; The oil separation core is blocked; Device failure; Host failure; Main motor fault; Fault phenomenon: the unit cannot be started and the fuse is broken; The temperature switch is broken; Loose wiring; Thermal relay of main motor acts; The thermal relay of cold storage fan motor acts; The transformer is broken; No power input (unit); Failure not eliminated (unit); The actuator is faulty.

Immediate cooling is to install the condenser of the cold storage in the box or building of the cooling equipment, use the volatilization of the refrigerant to immediately cool the air in the air, and use the cold air to cool the objects that need to be cooled. This kind of refrigeration is characterized by faster cooling speed, small heat conduction temperature difference and simple system software, so it is widely used.

Cold storage construction: which one is suitable for you? Which one is suitable for you?


Kampung Pasir Gudang VillageFresh keeping quick freezing warehouseWhat are the ways to judge qualified



Large space rate of quick-frozen warehouse: for quick-frozen warehouses of the same size, reasonable design schemes store more goods than unreasonable ones. For the fixed size quick freezing warehouse, how to design it to maximize its space rate is often an important problem considered by our designers. In the design scheme of Lukang medical quick-frozen warehouse, we reasonably designed to expand the original storage capacity of 300 boxes to 400 boxes, which increases the space a lot.

Selection of cold storage thermal insulation materials the use of cold storage thermal insulation materials is adapted to the times. It is specialized in cold storage installation, cold storage installation cold storage construction, fruit preservation cold storage, medical cold storage, 20-year-old brand with advantageous price and guaranteed quality! It not only has excellent fire resistance, so as to make the cold storage more energy-saving and improve the working efficiency of cold storage.

The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection PVC color steel plate and stainless steel plate. The advantage of this is to prevent the temperature transmission of cold storage board due to large internal and external temperature difference, and if bubbles are generated, it indicates that the refrigerant is leaking). And ask the combined cold storage engineering personnel to supplement the refrigerant and deal with the leakage. Check whether the sealing of the combined cold storage door is intact and eliminate it. Whether the refrigerator of the combined cold storage works. Whether the parameter setting of the computer controller of the cold storage is correct, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.

It is equipped with temperature compensation to automatically adjust the water temperature. The water temperature of ultrasonic atomization is 15-20 degrees. If our humidifier is connected with the warehouse, there is no temperature compensation, even if


Kampung Pasir Gudang VillageFresh keeping quick freezing warehouseWhat are the ways to judge qualified



For the ground insulation of large cold storage, we can that the ground insulation of medium-sized cold storage is more complex than that of small cold storage, and the ground insulation operation of large cold storage with larger warehouse area will be more complex. The common operations are as follows: first lay the ventilation pipe to prevent the ground from freezing drum cracking, then lay the XPS extruded plate (staggered laying is required when laying the extruded plate), then lay the moisture-proof and vapor barrier on the upper and lower sides of the extruded plate, then pour the reinforced concrete (generally at least 15cm thick), and then make the emery floor or epoxy floor according to the requirements. Among them, the XPS extruded plate is also laid according to the warehouse temperature. For example, the XPS extruded plate with thickness of 150 ~ 200mm needs to be laid in the general low-temperature cold storage, while the XPS extruded plate with thickness of 100 ~ 150mm can be laid in the high-temperature cold storage.

market.Clean and professional cold storage installation, cold storage installation, cold storage construction, fruit fresh-keeping cold storage, medical cold storage have stable performance, reliability and maintenance free. The technical level has reached the domestic level and the advanced level of similar international products. If there is a large amount of ice and water it must be cleaned in time, and it must not be knocked during cleaning, so as not to damage the ground and affect the service life of the cold storage.

The set values of various protective devices of the unit have been adjusted by the factory. Users are not allowed to change them at will.

In the process of realizing your dream, you must remove all the influences. It is very important to recognize that when these beautiful refrigerators are built in the villa room, the collection pit (pool) for flushing (thawing) and drainage should adopt the Countermeasures of avoiding freezing and cleaning and avoiding backflow of water.

Kampung Pasir Gudang Village.During production in the production workshop, not less than 40 & plusmn; 2kg/m3.

Preparation, prepare the project planning of cold storage, and prepare the construction site and construction materials. All kinds of materials for cold storage construction are customized according to the needs of customers. Sort out the construction site that meets the requirements, transport all installation materials to the construction site, check the material quality and model, and start the installation of cold storage after confirmation.

Anti odor floor drain shall be set on the pavement of refrigeration room and refrigeration unit room, and the height width ratio of floor drain water seal shall not be less than 50mm. The elevator shaft, electronic pit and other places convenient for drainage shall be provided with drainage and equipment to avoid backflow of water.