PhiladelphiaInstallation of large and small cold storagePlay the role of anti-theft

announcer:hp632HP195506591 release time:2021-12-31 17:19:43

The average service life of rigid polyurethane insulation structure with stable quality, long service life and high comprehensive cost performance can reach more than 30 years under normal use and maintenance conditions. Under the normal service conditions during the service life of the structure, it will not be affected by drying, or electrochemical corrosion, as well as the growth of insects, fungi or algae or rodents.

Cold storage has strong stability. Polyurethane foam technology makes it have superior bonding performance. The firm combination of polyurethane rigid foam and carrier layer is the basic premise to ensure the stability of external insulation layer. That is, under the unfavorable local temperature and humidity conditions, the characteristics of the cold storage still do not separate and fall off from the carrier layer and remain stable under normal conditions.

Philadelphia.Flow, temperature and water body of surface water around the construction area of surface water and water resources cold storage.

General quick-frozen warehouses are mostly cooled by refrigeration mechanism with low gasification temperature (ammonia or Freon)

.The factors affecting the installation cost of cold storage are as follows: cold storage construction: the site selection shall comply with laws and regulations and meet the relevant requirements for food hygiene and. And pay attention to protecting the environment and ecological balance. In addition, it shall be conducive to production, construction and dry ceremony.

Insufficient refrigeration dose and capacity in the system: insufficient refrigerant circulation is the main reason

Clean and professional cold storage installation, cold storage installation, cold storage construction, fruit fresh-keeping cold storage, medical cold storage have stable performance, safety, reliability and maintenance free. The technical level has reached the domestic level and the advanced level of similar international products. If there is a large amount of ice and water, it must be cleaned in time, and it must not be knocked during cleaning, so as not to damage the ground and affect the service life of the cold storage.


PhiladelphiaInstallation of large and small cold storagePlay the role of anti-theft



The equipment that needs to be installed in the warehouse and put into the warehouse shall be installed in place or placed in an appropriate position in the warehouse; The wall warehouse board shall be installed from the corner of the warehouse body and the professional cold warehouse shall be installed. The cold warehouse shall be installed. The cold warehouse shall be constructed. The fruit fresh-keeping cold warehouse and medical cold warehouse shall have high pressure rating, good waterproof performance, fire and high temperature resistance, strong overload capacity, corrosion resistance, radiation protection and long service life. The corner shall be temporarily fixed with 0.5 color plate angle steel; When installing each wall panel, evenly apply two layers of foaming material on the joint surface of male and female groove, and apply one layer of foaming material when installing polystyrene wall panel. The blanking shall be uniform and continuous; After the wallboard is installed in place, pull rivets at the lap joint of the internal and external steel plates of the two wallboards for connection and fixation, and the rivet spacing in the warehouse should be 300mm; When connecting the library plate in the form of eccentric hook connection, also known as leak detection process, is the last link of commissioning. This work can be divided into pressure, vacuum and ammonia filling leak detection stages.

2 - Installation of the vertical plate of the cold storage: select the angle first according to the site conditions and locate it (i.e. lock the vertical plate and the floor) to extend to both sides at this angle. Only lock the vertical plate and the vertical plate, and locate it when it meets the vertical angle. Put the beautiful plate in a conspicuous place. When installing it on the side of the evaporator, make the drainage pipe in advance, and make U-bend and silica gel outside the storage.

Honest management.According to the size and nature of the cold storage area and in combination with local regulations the construction form of food cold storage warehouse is to determine the plane layout based on the site, whether it is a single-layer or double-layer warehouse, and the structure is the selection of steel structure or reinforcement solidification. Cold storage capacity, production process, product stacking, temperature, etc. are used to determine the size and location of the cold storage room, which can save land; When the storage capacity is the same, the surface area of the outer enclosure structure is smaller than that of the single-layer cold storage, the dry consumption of food can be reduced, and the machinery and equipment cost and operation and management cost can be reduced accordingly. At the same time, due to the saving of thermal insulation materials, the civil construction cost per unit area is low and the investment cost is small; The multi-storey location can be reasonable, such as the cooling room can be used as the cold storage room, the attic on the top floor can be built into the ice making room, etc.

The medical cold storage has been widely used in the industry. For the use of the medical cold storage project, the management personnel must be familiar with the operation steps of the medical cold storage project.


PhiladelphiaInstallation of large and small cold storagePlay the role of anti-theft



Wall and floor fixtures shall start at corners. According to the plate layout drawing, transport the two plates at the corner of the required device to the device location. According to the plate beam height and the model of the angle iron for fixing the mushroom head nylon bolt, drill a hole at the corresponding elevation in the middle of the plate width. When drilling, the electric drill should be perpendicular to the plate surface. Put the mushroom head nylon bolt in the hole, tighten the angle iron, and tighten it horizontally, so as to make the nylon bolt on the surface of the warehouse plate slightly concave. When setting up the wall panels, foam data and other soft data should be laid on the floor slots along with the floor of the storehouse so as to avoid damaging the storehouse. After the two corner panels are neutrally removed from the floor, the plane position of the wallboard and the verticality of the storehouse should be adjusted in time according to the location of the laying line, and check whether the top elevation of the wallboard can be correct. After the position of the wallboard is correct, weld the angle iron on the plate beam and fix the inner and outer corners. When welding the angle iron parts, the angle iron parts of the warehouse plate shall be covered with a shield to avoid the high temperature of the welding ground baking the warehouse plate and welding slag on the warehouse plate during electric arc welding.

Word of mouth recommendation.In order to maintain a constant low temperature in the cold storage, attention should be paid to the installation of cold storage panels in Guizhou: the floor, wall and flat roof of the cold storage are laid with a certain thickness of thermal insulation materials to reduce the incoming heat from the outside. In order to reduce the absorption of solar radiation, the surface of the external wall of the cold storage is painted white or light color. Therefore, cold storage building is different from general industrial and civil buildings, and has its unique structure. Cold storage buildings should prevent the entry of air and the diffusion of water vapor.

Air volume regulation is the key factor to save energy. If we can do this well, the energy-saving effect of the fan can be determined. After effective adjustment, the fan can meet the flow or pressure requirements of production under the stable working conditions, and can save energy to the limit. In the process of implementing fan regulation, it is important to choose what regulation, which can directly affect the energy-saving effect of controlled atmosphere storage.

In the cold storage project, the selection of cold storage is related to the overall operation of cold storage in the future. The selection of high-quality cold storage is conducive to the use and maintenance of cold storage. This requires us to inquire more about the warehouse board for cold storage engineering. Before the construction of cold storage project, we should first realize the temperature requirements of cold storage and the importance of cold storage to cold storage. Because the cold storage project has high environmental requirements such as temperature, attention should be paid to the performance and material of the cold storage board when selecting the cold storage board.

Philadelphia.The closed cell structure and surface material of polyurethane rigid foam with good moisture-proof waterproof and corrosion resistance make it have better air resistance and water vapor resistance, and it can be made into inlaid connection structure during forming, which is easy to assemble. It does not need additional insulating layer to prevent moisture and saves a lot of trouble in laying insulating layer.

Indirect cooling is that the air in the warehouse is pumped into the air cooling device by the blower. The air is absorbed by the evaporation pipe circling in the cooling device, and then sent to the warehouse for cooling. The advantages of air cooling are rapid cooling, uniform temperature in the warehouse, and can bring harmful gases such as carbon oxide out of the warehouse during storage.

The quick-frozen warehouse is easy to load and unload. All the plates and walls of the quick-frozen warehouse are produced by molds. You can choose tens of millions of products. Professional cold storage installation, installation of cold storage, cold storage construction, fruit preservation cold storage, medical cold storage and transaction safety are guaranteed. Through internal concave convex groove connection loading, unloading and handling are convenient. The installation period is short. Small and medium-sized cold storage can be delivered in 2-5 days, The library body can be combined, separated or increased or decreased according to the needs of users.