2 - Installation of the vertical plate of the cold storage: select the angle first according to the site conditions and locate it (i.e. lock the vertical plate and the floor) to extend to both sides at this angle. Only lock the vertical plate and the vertical plate, and locate it when it meets the vertical angle. Put the beautiful plate in a conspicuous place. When installing it on the side of the evaporator, make the drainage pipe in advance and make U-bend and silica gel outside the storage.

Cold storage construction: which one is suitable for you? Which one is suitable for you?

Abbotsford.Opening and closing of valves of refrigeration system.

The quantity is large, and a special tally room (area) is set according to the needs of production and operation. The temperature of the tally area is usually controlled at 0 ~ + 7 ℃.

.Installation of refrigeration equipment. The refrigeration system of the cold storage includes evaporator and units outside the cold storage. All equipment shall be installed in accordance with the construction specifications, and corresponding protection measures shall be taken for the installed equipment.

Installation of unit electrical box: the unit electrical box shall be installed near the unit; Vertical installation. If the unit is installed on the top of the warehouse the distance between the box bottom and the top of the warehouse must be & amp; amp; gt; 100 mm; The electrical box can be fixed on the building wall or on the angle steel frame.

Precautions for purchase and shipment when using the medical cold storage project, the speed must be strictly guaranteed during the purchase and shipment of products. If the temperature of the medical cold storage is about degrees, the opening time must be strictly within 25 minutes. If the temperature of the medical cold storage is left and right degrees, the opening time can not be too high, strictly within minutes.


AbbotsfordPrecautions for medical cold storageHow to deal with technical service contracts



Emergency measures during the use of the medical cold storage project, it may also encounter power failure or power failure. In fact, most medical cold storage projects will be equipped with emergency equipment, so that the medical cold storage project can achieve the effect of normal power supply. Once the automatic temperature or humidity monitoring system is abnormal, the cold storage door should be closed in time, So as not to expose more air conditioners resulting in corresponding problems in the quality of stored products. The medical cold storage project also has a self rescue system in time. If the temperature of the cold storage exceeds the limit, the system cooling system will also be turned on. When the temperature returns to normal, it will be automatically turned off.

Frozen and refrigerated storage begins to shift to shelf and pallet storage in accordance with & amp; amp; amp; ldquo; FIFO & amp; amp; amp; rdquo; This is conducive to improving the quality of commodity storage and reducing losses.

There are two reasons: the refrigerant charge is insufficient. At this time, just add enough refrigerant.

where.The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection, and if bubbles are generated, it indicates that the refrigerant is leaking). And ask the combined cold storage engineering personnel to supplement the refrigerant and deal with the leakage. Check whether the sealing of the combined cold storage door is intact and eliminate it. Whether the refrigerator of the combined cold storage works. Whether the parameter setting of the computer controller of the cold storage is correct, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.

The products stored in the medical cold storage project must be managed by color code, so as to avoid the problem of purchase errors. In the process of handling, it is also necessary to strictly follow the instructions.

The drainage at the outlet of the cooling fan, the drainage of the volatile cooler and the road drainage of the refrigerated warehouse storing food or drinks shall not be immediately connected with the sewage and wastewater pipeline system software, but indirect drainage shall be adopted. For the flushing (thawing) water drainage of each layer in the double-layer cold storage, an exhaust valve equipment shall be set in front of the main riser for flushing (thawing) water drainage.


AbbotsfordPrecautions for medical cold storageHow to deal with technical service contracts



Cold storage design step: the selection of cold storage refrigeration system the selection of cold storage refrigeration system is mainly the use of cold storage refrigeration compressor and air conditioning evaporator. Generally, small and medium-sized refrigerators are dominated by fully enclosed refrigeration compressors. Due to the small output power of the fully enclosed refrigeration compressor, the price is relatively cost-effective; Small and medium-sized refrigerators are generally dominated by semi closed refrigeration compressors; Semi closed refrigeration compressor is adopted for large and medium-sized refrigerated warehouses. When adopting, ammonia refrigeration unit can also be considered. Because the output power of ammonia refrigeration unit is large and can be used for machine use, but the installation and management of refrigerated warehouses are cumbersome. When using the air-conditioning evaporator, the high-temperature cold storage uses the industrial cold fan as the air-conditioning evaporator. Its characteristic is that the temperature reduction speed is faster, which is characterized by very good temperature control effect and moderate cold storage.

Focus on Development.The quantity is large, and a special tally room (area) is set according to the needs of production and operation. The temperature of the tally area is usually controlled at 0 ~ + 7 ℃.

Do a good job of power failure early warning. The management personnel of the controlled atmosphere storage shall often pay attention to the notice of the local power department. In case of power restriction or line transformation, they shall do a good job in time. For sudden power equipment failure and artificial line, it is recommended to install power failure alarm, receive the alarm in time, and the loss will be reduced to a low level.

During the production of cold storage, the cold storage will produce fixed length, width and thickness according to the needs of various cold storage projects. Generally, 10cm thick cold storage plates are selected for high and medium temperature cold storage. The requirements for cold storage engineering plates of low-temperature storage and quick-frozen storage will be higher. Professional cold storage installation, installation, construction, fruit fresh-keeping cold storage and medical cold storage ensure the quality, Guarantee service. Guarantee quality. Your satisfaction is our pursuit! Welcome to inquire. In this case, use 12cm or 15cm thick library board. When you budget the cold storage project, you should pay attention to the density of the cold storage plate and the thickness of the steel plate when purchasing the cold storage plate. According to the regulations, the cold storage shall be distributed

Abbotsford.General quick-frozen warehouses are mostly cooled by refrigeration mechanisms, and those with very low gasification temperature are used as coolant to evaporate under low pressure and mechanical conditions, so as to achieve the purpose of cooling and reduction.

During the use of cold storage, attention shall be paid to the collision and scratch of the storage body to avoid the depression and corrosion of the storage plate, which will seriously reduce the local thermal insulation performance of the storage body.

The quick-frozen warehouse is easy to load and unload. All the plates and walls of the quick-frozen warehouse are produced by molds. You can choose tens of millions of products. Professional cold storage installation, installation of cold storage, cold storage construction, fruit preservation cold storage, medical cold storage and transaction safety are guaranteed. Through internal concave convex groove connection, loading, unloading and handling are convenient. The installation period is short. Small and medium-sized cold storage can be delivered in 2-5 days, separated or increased or decreased according to the needs of users.