Whether the parameters of refrigeration equipment are consistent. When the cold storage leaves the factory, the temperature and temperature difference parameters of the cold storage shall be customized according to the user's requirements. After understanding the technical parameters of the cold storage set the parameters on the refrigerator. During use, the air humidity is high and the defrosting interval is long. The common cold storage boards of cold storage include 100mm, 120mm, 150mm, 175mm and 200mm polyurethane thermal insulation boards, color steel tiles, stainless steel plates, salt thick steel plates, embossed aluminum plates, polyurethane spraying, etc. on both sides or single and double sides, more general color steel tiles are produced and processed into hidden grooves, which have light weight, high compressive strength,ReginaCold storage for fruit, good fire resistance, corrosion resistance and aging resistance, The cold storage board is simple and convenient to assemble, and is a wide range of raw materials selected for the heat insulation and heat preservation of the cold storage. The cost of stainless steel plate and salt plate increases, good waterproof performance and the professional cold warehouse shall be installed. The cold warehouse shall be installed. The cold warehouse shall be constructed. The fruit fresh-keeping cold warehouse and medical cold warehouse shall have high pressure rating, fire and high temperature resistance, corrosion resistance, radiation protection and long service life. The corner shall be temporarily fixed with 0.5 color plate angle steel; When installing each wall panel, evenly apply two layers of foaming material on the joint surface of male and female groove, and apply one layer of foaming material when installing polystyrene wall panel. The blanking shall be uniform and continuous; After the wallboard is installed in place, pull rivets at the lap joint of the internal and external steel plates of the two wallboards for connection and fixation, and the rivet spacing in the warehouse should be 300mm; When connecting the library plate in the form of eccentric hook connection, the eccentric hook shall be loosened once before installation to ensure reliable locking during installation.

Regina.If the wholesale equipment of the fresh-keeping storehouse is started again after a long-term suspension, the speed should be reduced at the initial stage of the wholesale opening of the fresh-keeping storehouse. Don't start too fast. It's better to reduce the speed at about 8-10 degrees every day. When the temperature drops to 0 degrees, it should be maintained for a period of time. Don't regulate it at will.

In the cold storage project the selection of cold storage is related to the overall operation of cold storage in the future. The selection of high-quality cold storage is conducive to the use and maintenance of cold storage. This requires us to inquire more about the warehouse board for cold storage engineering. Before the construction of cold storage project, attention should be paid to the performance and material of the cold storage board when selecting the cold storage board.

.The physical properties of polyurethane insulation board are relatively good we should first realize the temperature requirements of cold storage and the importance of cold storage to cold storage. Because the cold storage project has high environmental requirements such as temperature,ReginaPrice and installation of small cold storage, which can meet different needs. The polyurethane insulation board is also strict in the selection of materials. It is a special product manufacturing enterprise integrating R & D, cold storage installation, cold storage construction, fruit preservation cold storage and medical cold storage. It improves the overall performance of the polyurethane insulation board and enables the polyurethane insulation board to work for a long time, Polyurethane insulation board has also become one of the main exterior wall materials.

Another reason is that there are many refrigerants in the system. In this case, find the leakage point first, repair the found part and then fill in sufficient refrigerant.

The bacterial action of acid disinfectants is mainly to coagulate the protein in the bacteria. Common disinfectants include lactic acid, bleach, formalin, etc. Specifically, after the fish comes out of the freezer, clean the frost layer on the evaporating pipe group and keep the storehouse temperature below 50 degrees Celsius. Then, according to the volume of 50~100 grams per cubic meter volume of the frozen storeroom, the storeroom door is closed tightly with the sprayer, and the blower is started intermittently, so that the vinegar evaporates and flows in the storehouse, which makes the vinegar absorb a lot of fish smell.


ReginaHow much does it cost to install a small cold storageMatters needing attention in handling and application



It is equipped with temperature compensation to automatically adjust the water temperature. The water temperature of ultrasonic atomization is 15-20 degrees. If our humidifier is connected with the warehouse, there is no temperature compensation,ReginaProfessional installation of cold storage, even if

For the installation of power distribution system, each contact shall be installed with wire number for maintenance.

Compression refrigerator is commonly used. It is mainly composed of compressor, condenser, throttle valve and evaporation pipe. The evaporation pipe is installed in the refrigeration warehouse. When the liquid coolant passes through the evaporation pipe, it directly absorbs the heat in the warehouse and cools down.

Quality assurance.Application of parallel compressor in cold storage: the requirement of refrigeration capacity is large, and 5 to 50 refrigeration compressors under 20 Malige need to be used on weekdays; Long term operation, large load peak valley difference and significant departmental load; Frozen and refrigerated objects are novel foods that are easy to decay and degenerate, and have strict requirements for temperature and humidity.

Some cold bridge prevention measures shall be taken at the joints between polyurethane insulation boards.

The insulation board of the cold storage adopts polyurethane double-sided color steel plate. The main effect of this cold storage insulation board is good sealing performance, insulation effect and moisture-proof effect, so as to ensure the refrigeration effect of the cold storage. The electric cold storage door is adopted for the cold storage door, and the cold storage management personnel can timely and effectively open and close the door when entering and leaving, so as to avoid the loss of refrigeration capacity of the cold storage.


ReginaHow much does it cost to install a small cold storageMatters needing attention in handling and application



Regular oil discharge, descaling and air discharge: when there is a 0.1mm thick oil film in the evaporator coil, in order to maintain the set temperature requirements, the evaporation temperature will decrease by 5 ℃ and the power consumption will increase by more than 10; When the scale on the water pipe wall in the condenser reaches 5mm, the condensation temperature will rise by 8 ℃ compared with the original temperature, and the power consumption will increase. When the refrigeration system is mixed with non condensable gas and its partial pressure reaches 0.196mpa, the power consumption will increase by about 1

system.Polyurethane spraying is widely used in large and medium-sized refrigerators. Different well-known brands are produced at different prices, and the product quality is relatively large. However, the tightness of warehouse doors and windows shall be considered.

Requirements for the cold storage time of the device: the cold storage of the refrigeration system using ammonia as refrigerant shall be supported in the place with low population density around.

Regina.For water-cooled units, the turbidity of cooling water shall be frequently, the cooling water shall be replaced frequently, and whether the running, emitting, dripping, leakage and other conditions of the water supply system exist.

The temperature and humidity in the warehouse shall be kept uniform without movement; Try to finish the food in the warehouse at one time.

General quick-frozen warehouses are mostly cooled by refrigeration mechanisms, and those with very low gasification temperature are used as coolant to evaporate under low pressure and mechanical conditions, so as to absorb the heat in the warehouse, so as to achieve the purpose of cooling and reduction.