GilbertHow much is a square meter for installing a cold storageAnalysis on the wide application in the industry

announcer:hp632HP195506591 release time:2022-02-11 14:25:56

Frozen and refrigerated storage began to change to shelf and pallet storage to complete the goods according to & ldquo; First in first out & rdquo; It is conducive to improve the quality of commodity storage and reduce loss.

During the early operation of the refrigeration unit, carefully observe the oil return of the compressor and keep it clean. If it is found that the oil level is not clean enough or the oil level drops, replace it with new oil in time, so as to avoid bad compressor and reduce the service life of the compressor.

Gilbert.How to judge whether the controlled atmosphere storage is bad and the effect is poor? Under the same conditions, the required temperature can be reached in 10 minutes, but now it takes 30 minutes. In this way, the refrigeration is obviously slow and the effect is poor, which will directly affect the use cost.

In the cold storage project, the selection of cold storage is related to the overall operation of cold storage in the future. The selection of high-quality cold storage is conducive to the use and maintenance of cold storage. This requires us to inquire more about the warehouse board for cold storage engineering. Before the construction of cold storage project, we should first realize the temperature requirements of cold storage and the importance of cold storage to cold storage. Because the cold storage project has high environmental requirements such as temperature, attention should be paid to the performance and material of the cold storage board when selecting the cold storage board.

.Some cold bridge prevention measures shall be taken at the joints between polyurethane insulation boards.

Technical assurance measures for the installation of cold storage: during production in the production workshop, the production shall be carried out in strict accordance with the operation rules specified in ISO9002 quality operation, self inspection and inspection application shall be carried out to ensure that the factory pass rate is, and unqualified products are not allowed to leave the factory.

The quick-frozen warehouse is easy to load and unload. All the plates and walls of the quick-frozen warehouse are produced by molds. You can choose tens of millions of products. Professional cold storage installation, installation of cold storage, cold storage construction, medical cold storage and transaction safety are guaranteed. Through internal concave convex groove connection, loading, unloading and handling are convenient. The installation period is short. Small and medium-sized cold storage can be delivered in 2-5 days, The library body can be combined, separated or increased or decreased according to the needs of users.


GilbertHow much is a square meter for installing a cold storageAnalysis on the wide application in the industry



Large space rate of quick-frozen warehouse: for quick-frozen warehouses of the same size, reasonable design schemes store more goods than unreasonable ones. For the fixed size quick freezing warehouse, how to design it to maximize its space rate is often an important problem considered by our designers. In the design scheme of Lukang medical quick-frozen warehouse, we reasonably designed to expand the original storage capacity of 300 boxes to 400 boxes, which increases the space a lot.

If the warehouse is relatively small and you want to transform a miniature fruit fresh-keeping warehouse, you should ensure that the height in the warehouse is at least 8 meters, because the top of the cold storage and the top of the warehouse should reserve a height of at least 30 cm.

Moreover, polyurethane does not produce harmful gas at high temperature.

Test results.Wall and floor fixtures shall start at corners. According to the plate layout drawing, transport the two plates at the corner of the required device to the device location. According to the plate beam height and the model of the angle iron for fixing the mushroom head nylon bolt, the electric drill should be perpendicular to the plate surface. Put the mushroom head nylon bolt in the hole, tighten the angle iron, and tighten it horizontally, so as to make the nylon bolt on the surface of the warehouse plate slightly concave. When setting up the wall panels, foam data and other soft data should be laid on the floor slots along with the floor of the storehouse so as to avoid damaging the storehouse. After the two corner panels are neutrally removed from the floor, the plane position of the wallboard and the verticality of the storehouse should be adjusted in time according to the location of the laying line, and check whether the top elevation of the wallboard can be correct. After the position of the wallboard is correct, weld the angle iron on the plate beam and fix the inner and outer corners. When welding the angle iron parts, the angle iron parts of the warehouse plate shall be covered with a shield to avoid the high temperature of the welding ground baking the warehouse plate and welding slag on the warehouse plate during electric arc welding.

Suggestions on the quantity of polyurethane cold storage insulation materials: cold storage investment is a long-term and profitable investment. A high quantity of hair can certainly reduce the initial investment, but it is necessary to grasp a certain limit and comprehensively consider the long-term energy consumption and initial investment, because the insulation effect of polyurethane cold storage insulation materials has a parabolic linear correlation with its bulk weight; A large number of studies have shown that the foam bulk density has better thermal insulation performance at 33~35 kg / cubic meter. Therefore it is usually recommended that the number of thermostat refrigeratory outlets should be 22~23 square / ton.

Vent valve or water seal well shall be set at the outlet of flushing (thawing) drainage pipeline. Cold proof measures shall be taken for exhaust valves and water sealed wells in severe cold areas.


GilbertHow much is a square meter for installing a cold storageAnalysis on the wide application in the industry



After the cold storage at the corner is installed, the next cold storage can be installed along the direction of the corner. Adopt the similar installation of Zhang cold storage to install the thermal insulation board of the storage. Professional cold storage installation, installation of cold storage, cold storage construction, fruit preservation cold storage, medical cold storage, advanced technology strict testing, more affordable price and more preferential. Welcome to consult. Pay attention to its compactness and continuous uniformity.

Job description.There are two reasons: the refrigerant charge is insufficient. At this time, just add enough refrigerant.

Ice cubes are always available in the cold storage. For small cold storage the cost of using standby power supply or generator set is too high and the cost performance is low. In this case, some ice cubes must be always available in the cold storage. In case of power failure or refrigeration equipment failure, ice cubes can be used to maintain the temperature in the cold storage.

Polyurethane foam foam dimensional stability: cold storage polyurethane foam in severe temperature changes or at a relatively low temperature will appear dimensional changes (as contraction), the size changes often reflect bubble cracking or falling off, and these will inevitably affect the normal use of cold storage. In addition to regular simulation of performance testing, more emphasis is placed on the selection of high quality materials: special energy polyether compound use, so that the foam body mesh structure, greatly improving the foam low temperature resistance. At present, 4110 polyether commonly used in spraying materials contains a large number of functional components, and a large number of linear structures formed after reaction are difficult to be stable at low temperature; The use of the energy crosslinking agent also greatly improved the dimensional stability of the foam. The selected polyether adopts catalysis in the production stage, and the reaction is complete, so that the polyether maintains a high reaction rate (that is, reduce the bubble closed hole rate, achieve the effect of stable size, but it has sacrificed the thermal insulation performance of polyurethane cold storage insulation material foam.

Gilbert.We should implement regular maintenance and daily maintenance, professional cold storage installation, installation of cold storage, cold storage construction, fruit preservation cold storage, medical cold storage large quantity, excellent quality and low price, fire resistance - Waterproof - high temperature resistance, strong and durable, safe and reliable, and maintain the operation rate of the compressor.

The water tank is designed to be separated from the machine body and is double-layer. It will not drip due to condensation caused by internal and external temperature difference. It can be interlocked with the refrigeration system, it will not be humidified during refrigeration to prevent serious frosting of the fan.

Stretch perlite: stretch perlite is a kind of granular material with porous layout. The gap in it blocks out the heat. Professional cold storage installation, cold storage installation, cold storage construction, fruit fresh-keeping cold storage, medical cold storage, strict testing, quality assurance. Preferential activities are in progress. Welcome to consult. It has a good heat insulation effect. Then, the water vapor in the cold storage is easy to condense, its nature will be greatly reduced. Therefore, it is necessary to be careful to select extensional perlite as cold storage.