The temperature and humidity in the warehouse shall be kept uniform without movement; Try to finish the food in the warehouse at one time.

The refrigeration of cold storage pays more and more attention to the needs of environmental protection and energy saving. Professional projects include: cold storage installation, cold storage construction fruit fresh-keeping cold storage, medical cold storage and other related businesses. Merchants who hope to have this business please consider the wide scale of warehouse temperature control, the selection and placement of cooling equipment and the description of wind speed field, which are suitable for the cold storage needs of a variety of goods. Equipped with perfect storage temperature active detection, recording and active control equipment.

New-Westminster.Due to the slow cooling, all equipment will consume electric energy during operation. If the cooling is slow, the equipment will stop and cannot consume electricity, so the electricity charge will not be consumed. As a high energy consuming equipment, the daily power consumption of cold storage is relatively large. If the refrigeration effect is not good,New-WestminsterInstallation of freezer, the annual use cost will directly double several times. Moreover, if the equipment operates for a long time, the service life will be reduced accordingly which is something users don't want to see.

Improper adjustment or blockage of throttle valve, too large or too small refrigerant flow: improper adjustment or blockage of throttle valve will directly affect the refrigerant flow into evaporator. When the throttle valve is opened too large, the refrigerant flow is too large, the evaporation pressure and evaporation temperature also increase, when the throttle valve is opened too small or blocked, the refrigerant flow will also decrease, and the decline rate of warehouse temperature will also slow down.

.Install the electric control system. The electric control system of the cold storage mainly includes electric controller electric door, lighting and other electrical equipment in the cold storage. The power supply of the cold storage is required to be stable phase line and the power supply or backup power supply can be used as required. The circuit shall have reasonable discharge and corresponding protective measures.

The assembled cold storage body often adopts double-sided color steel plate of polyurethane thermal insulation material, storage and circulation effect and reduces operation energy consumption. Of course, more important is the choice of refrigeration system. For example, at present, the refrigeration system of fluorine refrigerant is still the mainstream, but when selecting the type and power of cooling equipment, it is necessary to calculate the data for the installation of cold storage, and then make a high-quality choice.

It is built in the room. There shall be excellent drainage pipe standards around the cold storage, the soil temperature shall be low, there shall be interlayer under the cold storage, and good natural ventilation shall be maintained. Maintaining dryness is very important for the cold storage. In addition, before the construction of the cold storage, the phase electricity of the relative volume shall be built according to the output power of the refrigeration unit. If the cold storage is water-cooled and radiating, the tap water pipeline shall be paved and the FRP cooling tower shall be built.


New-WestminsterInstallation and construction of cold storageFocus on development



Step of cold storage design: define the volume of the cold storage warehouse. The size of the cold storage should be based on the design of a large number of agricultural products to be stored for a long time. This volume is calculated based on the essential volume of stored goods accumulated in the cold storage, plus the row to row corridors, the indoor space between the pile and the wall, the ceiling and the gap of the packaging house. After the volume of the cold storage is determined, the length and height width ratio of the cold storage shall be determined. Necessary auxiliary engineering buildings and equipment shall also be considered in the design of cold storage, such as working intermediate, packaging and combing room, special tool warehouse, loading and unloading platform, etc.

It takes 24 hours after the installation of the controlled atmosphere warehouse to deposit the goods, so as to quickly meet the temperature required by the goods and ensure that the controlled atmosphere warehouse equipment can operate normally.

How to maintain the refrigeration compressor in the cold storage in order to prolong its service life and reduce the occurrence of faults in the use process. The refrigeration compressor in the cold storage needs regular maintenance. Here we introduce the maintenance of the compressor in the cold storage.

install.Drainage measures shall be provided for the villa room and overhead layer of the road surface of the cold storage engineering building.

The bubble density is 38 kg to 40 kg / m3 per cubic meter, and the steel plate thickness generally needs to be more than 0.4 mm to meet the standard. On the market, the main raw materials of special cold storage board for cold storage project are polyphenylene, polyethylene and polyphenylene grease. The density of thermal insulation material foamed by polyphenylene is thin, and the thermal insulation coefficient is not very high; After a certain ratio of polyethylene, it can foam cold storage insulation materials with appropriate density and good thermal insulation effect, and has high load-bearing capacity; Polyphenylene resin has strong water absorption,New-WestminsterCold storage installation cold storage installation, but poor heat insulation. Therefore, the polyurethane sandwich board with very good performance belongs to the polyurethane sandwich board. Although it is slightly higher, the polyurethane board has very good thermal insulation performance and does not absorb moisture.

How to maintain the refrigeration compressor in the cold storage in order to prolong its service life and reduce the occurrence of faults in the use process. The refrigeration compressor in the cold storage needs regular maintenance. Here we introduce the maintenance of the compressor in the cold storage.


New-WestminsterInstallation and construction of cold storageFocus on development



Polystyrene foam: polystyrene foam is a new type of synthetic thermal insulation material. It is a kind of plastic, with small density, light weight, strong heat insulation effect and excellent low temperature resistance. However, due to its cold shrinkage, it is not very convenient for installation.

Installation material list.We should implement regular maintenance and daily maintenance, professional cold storage installation, installation of cold storage, cold storage construction, fruit preservation cold storage, medical cold storage, large quantity, excellent quality and low price, fire resistance - Waterproof - high temperature resistance, strong and durable, safe and reliable, and maintain the operation rate of the compressor.

The refrigerator room with high-voltage cabinet and distribution cabinet shall be equipped with special tools and protection for high-voltage operation.

The installation of cold storage board is a link of the cold storage installation project. High price cold storage installation of various specifications, cold storage installation, cold storage construction, medical cold storage. Waste merchants, industry, enterprises and power departments are welcome to visit and negotiate! The cold storage body and storage plate include: floor, vertical plate and ceiling plate. The installation of storage plates in different directions and precautions are as follows: enter the construction site, verify the construction situation according to the construction drawings, determine the equipment installation position, and then refer to the following specifications.

New-Westminster.The temperature and humidity in the warehouse shall be kept uniform without movement; Try to finish the food in the warehouse at one time.

The cooking materials and foods refrigerated in the quick-frozen warehouse contain a certain amount of fat, protein and starch. The existence of these nutrients will make molds and bacteria multiply and grow in large numbers. In order to do a good job in the hygienic management of cold areas and ensure the refrigeration quality of food and cooking raw materials, it is necessary to carry out the hygienic disinfection of cold areas regularly.

Floor insulation of medium-sized cold storage the structure of medium-sized cold storage is what we often call the surface, that is,New-WestminsterRefrigeration and fresh-keeping cold storage, the top and wall are made of color steel plate / stainless steel with appropriate thickness of polyurethane and other insulation materials, while the ground needs to be insulated separately. At present the common operations in the market are: laying the ground with XPS extruded board, laying moisture-proof and steam isolating SPS materials above and below the extruded board respectively, and then pouring concrete or reinforced concrete.