MkushiDesign and installation principle of cold storageWhat to pay attention to during operation

announcer:hp632HP195506591 release time:2021-12-30 09:49:42

Reasonably adjust the cold storage evaporator and defrost in time: Generally speaking, every 1 ℃ increase in the evaporation temperature of the cold storage can save energy by 2 ~ 5. Therefore, the liquid supply can be adjusted to increase the evaporation temperature as much as possible.

At ordinary times, users should check the sealing degree of the gap of the cold storage, and notify the cold storage for maintenance in time if damaged parts are found.

Mkushi.If the engineering design of logistics cold storage should bear the important responsibility of low-temperature storage and transportation, in addition to paying attention to the planning of the above basic functions, KFC refrigeration suggests that enterprises can also configure the classification, scale, unpacking, packaging, etc. of large packaging, product portfolio packaging, trademark, So as to better improve the quality of refrigeration distribution center and realize greater value return.

2 - cold storage

.The two sets of connectors between the cold storage shall be wedged tightly, and the two sets of connectors shall be fixed at the upper, outer and lower sides of the cracks in the cold storage respectively. The lower connector shall be as close as possible, the turbidity of cooling water shall be frequently, the cooling water shall be replaced frequently, and whether the running, emitting, dripping, leakage and other conditions of the water supply system exist.

Requirements for refrigeration equipment in quick freezing warehouse: the strict sealing of quick freezing warehouse is obviously different from that of ordinary quick freezing warehouse. Therefore, all through wall pipelines must be equipped with sleeves the frost flushing water return pipeline must be equipped with U-shaped bend water seal, and the main frost flushing and return pipeline outside the warehouse shall be equipped with air filling port to prevent the gas in the warehouse from being pumped out of the warehouse by negative pressure. In addition, due to the good sealing of the quick freezing warehouse, the set fluctuation range of the warehouse temperature should not be too large to prevent excessive positive and negative pressure from damaging the warehouse body.


MkushiDesign and installation principle of cold storageWhat to pay attention to during operation



The drainage at the outlet of the cooling fan, the drainage of the volatile cooler and the road drainage of the refrigerated warehouse storing food or drinks shall not be immediately connected with the sewage and wastewater pipeline system software, but indirect drainage shall be adopted. For the flushing (thawing) water drainage of each layer in the double-layer cold storage, an exhaust valve equipment shall be set in front of the main riser for flushing (thawing) water drainage.

The area of wires in the conduit shall not exceed 50%.

Install the temporary lighting facilities in the warehouse, install and arrange the construction electrical equipment, and do a good job in rain proof, moisture-proof, anti-collision, anti binding and other safety protection.

supply.When hot ammonia defrosting or electric defrosting is selected as the cooling fan, professional cold storage installation, cold storage installation, cold storage construction, fruit preservation cold storage, medical cold storage, safety, environmental protection and economy! The products are exported to foreign countries and are deeply trusted. Defrosting and drainage can be discharged immediately. Electric heat tracing and insulation can be selected for the defrosting and drainage pipeline of the warehouse location.

Cold storage construction: which one is suitable for you? Which one is suitable for you?

Install the library body. Generally, the warehouse body can be divided into small warehouse body and large warehouse body. The small warehouse body is basically a combined cold storage assembled with warehouse plate. The large warehouse body is mostly a civil cold storage. The assembled or constructed warehouse body is generally required to be flat, compact and solid, without hollow feeling, load-bearing, antifreeze, moisture-proof, etc.


MkushiDesign and installation principle of cold storageWhat to pay attention to during operation



Suggestions on the quantity of polyurethane cold storage insulation materials: cold storage investment is a long-term and profitable investment. A high quantity of hair can certainly reduce the initial investment, but it is necessary to grasp a certain limit and comprehensively consider the long-term energy consumption and initial investment, because the insulation effect of polyurethane cold storage insulation materials has a parabolic linear correlation with its bulk weight; A large number of studies have shown that the foam bulk density has better thermal insulation performance at 33~35 kg / cubic meter. Therefore, it is usually recommended that the number of thermostat refrigeratory outlets should be 22~23 square / ton.

Welcome calls .Step of cold storage design: selection and laying of cold storage thermal insulation materials. The use of cold storage thermal insulation materials must be adjusted to the time, which not only has excellent fire resistance, but also has high cost performance. There are several types of cold storage insulation materials. One is the plate produced and processed into a fixed shape and specification, with fixed length total width and thickness. The cold storage plate with relative specification and model can be selected according to the installation of the warehouse body. The high and medium temperature cold storage generally adopts 10cm thick cold storage plate, 12cm or 15cm thick cold storage board is generally used for ultra-low temperature cold storage and freeze-cleaning cold storage; Another kind of cold storage can be sprayed with polyurethane spray paint and polyurethane foam, and the raw materials can be sprayed into the brick or concrete warehouse of the cold storage to be built immediately. After shaping, it is both waterproof and thermal insulation. Thermal insulation materials include polyurethane, polystyrene grease, etc. Polyurethane is non hygroscopic and has good fire resistance, but the cost is high; Polystyrene resin has strong water absorption capacity and weak fire resistance, but the cost is low.

Evaporation temperature the sweating temperature of the refrigeration in the wafer machine needs to be lower than the air temperature in order to transfer heat from the engine room to the refrigerant. Usually, the temperature difference of room air conditioner is between 12C and 14C. If the temperature difference cannot be maintained due to adverse factors, carefully observe the oil return of the compressor and keep it clean. If it is found that the oil level is not clean enough or the oil level drops replace it with new oil in time, so as to avoid bad compressor and reduce the service life of the compressor.

Mkushi.Various construction materials, such as material certificate, test report and stage acceptance record, shall be carried out simultaneously with the project construction, carefully, timely, accurately and comprehensively reflect the whole process of production and construction, and actively cooperate with the owner in design change and technical negotiation.

At ordinary times, users should check the sealing degree of the gap of the cold storage, and notify the cold storage for maintenance in time if damaged parts are found.

Refrigeration system: refrigeration system is the core part of cold storage design. It is the key to determine the economy environmental protection and performance of cold storage.