Janubas SuraSmall cold storage factory installationFreezing point special new offer

announcer:hp632HP195506591 release time:2021-12-10 23:52:56

The spacing of pull rivets at inner and outer corners is 300mm and 200mm respectively; After the polystyrene library is installed, but use fan to supply air for refrigeration, because the gas in the quick freezing storehouse needs to be circulated and dispersed regularly to avoid carbon oxide poisoning caused by high concentration of carbon oxide in local areas. Therefore, in the quick freezing warehouse, the refrigeration equipment needs to be used together with the air conditioning equipment. The selection of refrigeration equipment is different from that of low-temperature freezer and ordinary quick freezing warehouse.

Janubas Sura.Whether it is a fruit fresh-keeping warehouse or other cold storage, there are many details to pay attention to in the transformation of the cold storage. If other small items are not done well, it will bring a lot of trouble to the later use, such as high energy consumption and small problems.

8. This shows the importance of regular oil discharge, descaling and air discharge in the refrigeration system of cold storage.

.The assembled cold storage body often adopts double-sided color steel plate of polyurethane thermal insulation material, which has excellent thermal insulation performance storage and circulation effect and reduces operation energy consumption. Of course, more important is the choice of refrigeration system. For example, at present, the refrigeration system of fluorine refrigerant is still the mainstream, but when selecting the type and power of cooling equipment, it is necessary to calculate the data for the installation of cold storage, the drainage of the volatile cooler and the road drainage of the refrigerated warehouse storing food or drinks shall not be immediately connected with the sewage and wastewater pipeline system software but indirect drainage shall be adopted. For the flushing (thawing) water drainage of each layer in the double-layer cold storage, an exhaust valve equipment shall be set in front of the main riser for flushing (thawing) water drainage.

Fault phenomenon: high current or tripping during unit startup, and problems of user air switch; Input voltage is too low; The star angle conversion interval is too short (it should be 10 ~ 12 seconds); Hydraulic cylinder failure (no reset); Intake valve failure (too large opening or stuck); Loose wiring; Host failure; Main motor fault; 1TR time relay is broken (relay unit).


Janubas SuraSmall cold storage factory installationFreezing point special new offer



Cold storage design steps: selection and preparation of cold storage location. According to the application characteristics, cold storage can be divided into sexual cold storage, retail cold storage and large-scale cold storage. When large-scale cold storage starts to build a planting area with more centralized hand supply, factors such as superior geographical location and contact with the market should also be taken into account. The cold storage should be located in a cool place without sunlight and frequent warm air. Small and medium-sized cold storage is better

System blowdown: the standby air compressor is used. When the air compressor cannot be solved, the ammonia compressor can be used instead.

The average service life of rigid polyurethane insulation structure with stable quality, long service life and high comprehensive cost performance can reach more than 30 years under normal use and maintenance conditions. Under the normal service conditions during the service life of the structure, it will not be affected by drying, or electrochemical corrosion, as well as the growth of insects, fungi or algae or rodents.

High value.The quantity is large, and a special tally room (area) is set according to the needs of production and operation. The temperature of the tally area is usually controlled at 0 ~ + 7 ℃.

The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection, and if bubbles are generated, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.

The foaming technology of polyurethane with strong stability makes it have superior bonding performance. The firm combination of polyurethane rigid foam and carrier layer is the basic premise to ensure the stability of external insulation layer. That is, under the unfavorable local temperature and humidity conditions, it can bear various internal and external combined loads such as wind force, self weight and normal collision, and the insulation layer still does not separate and fall off from the carrier layer and remains stable in the state.


Janubas SuraSmall cold storage factory installationFreezing point special new offer



Feasibility of the design scheme: the design of the quick-frozen warehouse can not be taken for granted. Many restrictive factors should be considered. In practice, a reasonable design scheme should be given according to local conditions. For example, the large-scale quick-frozen warehouse I built for my family should be refrigerated with ammonia in theory, because the refrigeration capacity of ammonia refrigeration is large, and I found that it is cheap to replicate cold through actual field investigation.

Packaging strategy.Compression refrigerator is commonly used. It is mainly composed of compressor, condenser, throttle valve and evaporation pipe. The evaporation pipe is installed in the refrigeration warehouse. When the liquid coolant passes through the evaporation pipe, vibration will continue to cause loosening or cracking of the upper connecting pipe of the generator unit. If abnormal noise is found during the whole operation of the equipment, it shall be shut down for inspection before operation. The maintenance functions of the refrigeration unit have been set and do not need to be adjusted.

Acid disinfectant can be used for mold removal and disinfection of quick-frozen warehouse.

Janubas Sura.Cold storage design segmentation: several different partitions shall be reasonably planned and divided according to purpose and temperature. For example: processing room, sorting room quick freezing room, refrigeration room, channel unloading platform, etc.

The products stored in the medical cold storage project must be managed by color code, so as to avoid the problem of purchase errors. In the process of handling, it is also necessary to strictly follow the instructions.

Wall and floor fixtures shall start at corners. According to the plate layout drawing, transport the two plates at the corner of the required device to the device location. According to the plate beam height and the model of the angle iron for fixing the mushroom head nylon bolt, drill a hole at the corresponding elevation in the middle of the plate width. When drilling, the electric drill should be perpendicular to the plate surface. Put the mushroom head nylon bolt in the hole, tighten the angle iron, and tighten it horizontally, so as to make the nylon bolt on the surface of the warehouse plate slightly concave. When setting up the wall panels, foam data and other soft data should be laid on the floor slots along with the floor of the storehouse, so as to avoid damaging the storehouse. After the two corner panels are neutrally removed from the floor, the plane position of the wallboard and the verticality of the storehouse should be adjusted in time according to the location of the laying line, and check whether the top elevation of the wallboard can be correct. After the position of the wallboard is correct, weld the angle iron on the plate beam and fix the inner and outer corners. When welding the angle iron parts, the angle iron parts of the warehouse plate shall be covered with a shield to avoid the high temperature of the welding ground baking the warehouse plate and welding slag on the warehouse plate during electric arc welding.