According to the size and nature of the cold storage area and in combination with local regulations, the construction form of food cold storage warehouse is to determine the plane layout based on the site, whether it is a single-layer or double-layer warehouse, and the structure is the selection of steel structure or reinforcement solidification. Cold storage capacity production process, product stacking refrigeration, temperature, etc. are used to determine the size and location of the cold storage room, so that it can become a whole.

Requirements for refrigeration equipment in quick freezing warehouse: the strict sealing of quick freezing warehouse is obviously different from that of ordinary quick freezing warehouse. Therefore, how to seal the refrigeration equipment is the key. First of all, all through wall pipelines must be equipped with sleeves, the frost flushing water return pipeline must be equipped with U-shaped bend water seal, and the main frost flushing and return pipeline outside the warehouse shall be equipped with air filling port to prevent the gas in the warehouse from being pumped out of the warehouse by negative pressure. In addition due to the good sealing of the quick freezing warehouse, the set fluctuation range of the warehouse temperature should not be too large to prevent excessive positive and negative pressure from damaging the warehouse body.

Chirpan.Do a good job of power failure early warning. The management personnel of the controlled atmosphere storage shall often pay attention to the notice of the local power department. In case of power restriction or line transformation, they shall do a good job in time. For sudden power equipment failure and artificial line, it is recommended to install power failure alarm, receive the alarm in time, and the loss will be reduced to a low level.

Preparation, prepare the project planning of cold storage, and prepare the construction site and construction materials. All kinds of materials for cold storage construction are customized according to the needs of customers. Sort out the construction site that meets the requirements transport all installation materials to the construction site, check the material quality and model, and start the installation of cold storage after confirmation.

.The door of the combined cold storage is not tightly closed. Please adjust the distance between the hinge on the door and the door lock and the storage body.

The water tank is designed to be separated from the machine body and is double-layer. It will not drip due to condensation caused by internal and external temperature difference. It can be interlocked with the refrigeration system, that is, it will not be humidified during refrigeration to prevent serious frosting of the fan.

2. Maintenance of food cold storage. In a position convenient for operation outside the door of the refrigerator room, a main switch for cutting off the power supply of the refrigeration compressor shall be set. This switch shall be able to stop the operation of the refrigeration compressor, a button switch shall be added next to each refrigeration compressor.


ChirpanCold storage installation engineering manufacturerHow does the stock market run after rising and falling



Installation of unit electrical box: the unit electrical box shall be installed near the unit; Vertical installation. If the unit is installed on the top of the warehouse, the distance between the box bottom and the top of the warehouse must be & amp; amp; gt; 100 mm; The electrical box can be fixed on the building wall or on the angle steel frame.

The installation of refrigeration pipeline requires that the diameter of copper pipe shall be selected in strict accordance with the interface of compressor suction and exhaust valve. When the separation between condenser and compressor exceeds 3M the pipeline diameter shall be increased.

Cold storage has good water tightness. Polyurethane rigid foam has low water absorption, good permeability to water vapor, foam holes, disconnected and closed porosity of more than 95%. It is a dense microporous foam material, which is more dense than air surface, and is not easy to permeate. It belongs to hydrophobic materials.

Recommendation and consultation.Thermal insulation rigid polyurethane has low thermal conductivity and good thermal performance. When the density of rigid polyurethane is 35 ~ 40kg / m3, the thermal conductivity is only 0.018 ~ 0.024w / (m.k), which is the lowest among all thermal insulation materials at present.

The construction of small cold storage is widely used in life, such as food industry, manufacturing industry, do you know cold storage? Especially the construction process and steps of cold storage. Understanding the construction process and steps of cold storage is helpful for all links of cold storage maintenance.

Cold storage design steps: selection and preparation of cold storage location. According to the application characteristics, cold storage can be divided into sexual cold storage, retail cold storage and large-scale cold storage. When large-scale cold storage starts to build a planting area with more centralized hand supply, factors such as superior geographical location and contact with the market should also be taken into account. The cold storage should be located in a cool place without sunlight and frequent warm air. Small and medium-sized cold storage is better


ChirpanCold storage installation engineering manufacturerHow does the stock market run after rising and falling



Installation of unit electrical box: the unit electrical box shall be installed near the unit; Vertical installation. If the unit is installed on the top of the warehouse, the distance between the box bottom and the top of the warehouse must be & amp; amp; gt; 100 mm; The electrical box can be fixed on the building wall or on the angle steel frame.

quality.In fact, there are some unique installation skills when installing the cold storage? The cold storage installed according to these skills is often short in both effect and quality, and the specific installation skills of the cold storage will also make some relatively detailed introduction for you in the following article. When installing the cold storage, you should install it from the corner first. Later, according to the height of the cold storage, make a hole in the middle of the insulation board behind the angle iron parts

Daily maintenance and management of fruits after Warehousing: timely the temperature and humidity in the cold storage, strictly control the temperature in the cold storage, timely eliminate the bad gas in the cold storage, and adjust the temperature and humidity of the cold storage according to the different requirements of different fruits on the storage environment. If long-term drying will affect the color of the fruit, consider using a humidifier to adjust the humidity in the cold storage.

The efficiency of the compressor is low, and the refrigerating capacity can not meet the load requirements of the warehouse: due to the long-term operation of the compressor, the cylinder sleeve, ring and other parts are seriously worn, the long-term cold storage installation, installation, construction, fruit preservation, medical cold storage and other brand products, the designated products are complete, the quality is guaranteed, and the sealing performance will be reduced accordingly with the increase of the matching clearance, and the refrigeration capacity will be reduced. When the refrigerating capacity is less than the heat load of the warehouse, smooth, stable and safe. Polyurethane material has stable porosity structure and basically closed pore structure. It not only has excellent thermal insulation performance, but also has good freeze-thaw resistance and sound absorption performance. Under normal service and maintenance conditions, the life expectancy of rigid foam polyurethane insulation can reach more than 30 years. During the structural life period, it can reach the unit price of dry, wet or electric corrosion under normal service conditions, while the unit price of insect, fungus or algae foam material is higher than other traditional insulation materials, but heating will increase the cost and the cooling cost will be greatly reduced.

2 - Installation of the vertical plate of the cold storage: select the angle first according to the site conditions and locate it (i.e. lock the vertical plate and the floor) to extend to both sides at this angle. Only lock the vertical plate and the vertical plate, and locate it when it meets the vertical angle. Put the beautiful plate in a conspicuous place. When installing it on the side of the evaporator, make the drainage pipe in advance, and make U-bend and silica gel outside the storage.

It is built in the room. There shall be excellent drainage pipe standards around the cold storage, the soil temperature shall be low, there shall be interlayer under the cold storage, and good natural ventilation shall be maintained. Maintaining dryness is very important for the cold storage. In addition, before the construction of the cold storage, the phase electricity of the relative volume shall be built according to the output power of the refrigeration unit. If the cold storage is water-cooled and radiating, the tap water pipeline shall be paved and the FRP cooling tower shall be built.