MalanqiDry type transformer unitMeticulous workmanship

announcer:hp122HP117294921 release time:2024-04-17 13:08:19

The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

For example, in the 1970s, the radio programs applied by every family in the countryside had a ground wire, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.

Malanqi.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

Causes of fire in power transformer

.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

Protective measures for damping of dry-type transformer


MalanqiDry type transformer unitMeticulous workmanship



Oil leakage of bolt or pipe external thread

Two point grounding device of iron core caused by residual welding scar;

Manufacturing process and steps of dry-type transformer

Where to sell API.Avoid the load operation of power transformer: if the load operation is long-term,MalanqiDimensions of 1600KVA oil immersed transformer, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.


MalanqiDry type transformer unitMeticulous workmanship



In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

Focus on Development.Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube,MalanqiPower transformer picture, carry out it twice, and then draw the oil sample.

Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.

The whole process of hanging the core of dry-type transformer is more critical,Malanqi100 kW dry type transformer, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

Malanqi.The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

Power transformer factory