Iged EkitiOil immersed transformer 50KVARequirements of various value-sensing materials

announcer:hp122HP117294921 release time:2024-04-29 15:02:40

What is the wiring mode of dry-type transformer?

Oil leakage of heat pipe radiator

Iged Ekiti.For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition, the oil with the same basic, there is generally no problem. However, if there is more new remaining oil,Iged EkitiHow much is a 160 box transformer, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.

The voltage regulating tap changer is not in place or poor

.Difference between dry-type transformer and oil immersed transformer:

If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard,Iged EkitiPrice of 200 KVA oil type transformer, production process and quality standard of electromagnetic shielding.

At rated power, the ratio of output power to input power of transformer is called the efficiency of transformer, i.e. & ETA; Is the efficiency of the transformer; P1 is the input power and P2 is the output power.

The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, and between the electromagnetic coil and the tap changer.

Where is good.For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

How to reduce the failure of dry-type transformer?

When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance,Iged EkitiDistribution transformer quotation, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.


Iged EkitiOil immersed transformer 50KVARequirements of various value-sensing materials



The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Customer first.Seal oil leakage

Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.

Dry type transformer company

Iged Ekiti.What is the wavelength of oil immersed transformer?

Before no-load impulse closing the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

How much is the power transformer