Kaifei80 KVA oil immersed transformerHow to reduce the exposure time

announcer:hp122HP117294921 release time:2024-04-29 15:19:18

When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

Kaifei.The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

.Falling foreign matters and piercing

The dry-type transformer is composed of two winding resistances, resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D, Y & rdquo;, & ldquo; y, D & rdquo; and & ldquo; D, D & rdquo;. In China, only & ldquo; y, Y & rdquo; and & ldquo; y D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn0 wiring group, when UAB and UAB overlap, the minute hand points to 12. & ldquo; 12 & rdquo; in the new wiring group, it is indicated by & ldquo; 0 & rdquo.

Then clamp the branch pipe with your thumb,KaifeiSubstation transformer, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.


Kaifei80 KVA oil immersed transformerHow to reduce the exposure time



Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

The rate of transformer is: n = P2 / p1x1o%, that is, the load of transformer is: 0 = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full the rate is very large. Therefore,KaifeiBox type transformer 160KVA price, Generally, it is about 50%, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.

How to reduce the failure of dry-type transformer?

How many?.Operation and maintenance management of oil immersed transformer

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;


Kaifei80 KVA oil immersed transformerHow to reduce the exposure time



The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min,KaifeiScb11 dry type transformer size, and the time interval of each closing shall not be less than 5min.

Economic management.The switching power supply lacks one phase of power;

When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor so it can be managed and used in a mixed manner.

Before no-load impact closing, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

Kaifei.Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

Solenoid insulation deterioration

Oil leakage at electric welding position