Benisaf10kV dry type transformer testRelief of financial pressure

announcer:hp122HP117294921 release time:2024-04-17 12:43:16

Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

Careless maintenance and insulation damage

Benisaf.This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator,BenisafHow much is the price of 250kVA box transformer, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

.When the full load test is carried out and everything is normal, the load can be connected.

Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.

Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).


Benisaf10kV dry type transformer testRelief of financial pressure



What about oil immersed transformer fire?

Step up process of dry-type transformer?

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

middleman.The whole process of hanging the core of dry-type transformer is more critical, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope,BenisafAdvantages and disadvantages of oil immersed transformer, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

Sound, it will cause great damage.


Benisaf10kV dry type transformer testRelief of financial pressure



Oil leakage of porcelain pot and laminated glass oil level gauge

build.Oil immersed transformer company

How to select dry-type transformer

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

Benisaf.If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct,BenisafPrice of box transformer 1600, and there shall be no dirt.

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.