AngolaDry type transformer brandSeven characteristics to talk about for you

announcer:hp122HP117294921 release time:2024-04-17 12:48:32

there are empty welding

Loose core screw

Oil leakage of cast iron parts

Angola.How to maintain dry-type transformer?

Common problems of tap changer of power transformer

.Noise dispersion of dry-type transformer

Seal oil leakage

The main reason is that the welding quality of electric welding is poor, needle holes,Angola10kV dry type transformer test, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.


AngolaDry type transformer brandSeven characteristics to talk about for you



Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage),AngolaPower transformer manufacturer, it indicates that the transformer is seriously damp, and the trial operation shall be terminated.

The method and whole process of taking oil sample of power transformer are as follows:

Trustworthy.Oil leakage at electric welding position

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

Different diversion methods, while oil transformers mostly use porcelain waterproof casing;


AngolaDry type transformer brandSeven characteristics to talk about for you



Dry type transformer factory

Free consultation.Oil leakage of cast iron parts

The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT100 temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as 420mA analog quantity. If it is to be far away (the distance can reach 1200m, the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter and 31 transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt100 thermistor sensor, so as to further improve the stability of the temperature maintenance system software.

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

Angola.The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized,AngolaInstallation drawing of dry-type transformer, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.

Power transformer plant

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.