Nai meihengInstallation of electric elevators for fire protectionHow does the sense of value try to assist the mechanical work

announcer:hp935HP175192871 release time:2024-01-15 12:11:32

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

Nai meiheng.In addition, when adding hydraulic oil, it is necessary to ensure the quality of the hydraulic oil, as some hydraulic oil manufacturers will choose hydraulic oil with poor quality. Hydraulic oil such as hydraulic lifting platforms not only cannot have any effect on folding arm elevators, but also affects the working efficiency of folding arm electric elevators due to deterioration issues.

To ensure safe and reliable braking of the lifting platform and prevent accidents a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

.Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.


Nai meihengInstallation of electric elevators for fire protectionHow does the sense of value try to assist the mechanical work



The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Alarm devices can be divided into fixed and mobile platforms, rail type and scissor type (curved arm type) to distinguish between overload or equipment malfunction. Fixed types include: scissor lift cargo elevator, chain electric elevator, and installation

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

Quality assurance.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, stable operation, low noise, accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high it can be replaced once a year. The hydraulic oil must be clean, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.


Nai meihengInstallation of electric elevators for fire protectionHow does the sense of value try to assist the mechanical work



Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

offer.The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Construction electric elevators should be equipped with lower limit switches that are sensitive and reliable.

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value,Nai meihengInstallation of electric elevators for fire protection, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

Nai meiheng.To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern,Nai meihengDecoration electric elevator, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.