Nai meihengElectric hydraulic platform elevatorHow to reduce the failure

announcer:hp935HP175192871 release time:2024-03-18 11:20:49

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

Nai meiheng.The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

.When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

The scaffolding of the parking platform should be laid tightly and firmly.


Nai meihengElectric hydraulic platform elevatorHow to reduce the failure



Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

The upward movement of the hydraulic cylinder involves lifting heavy objects, and the return oil from the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve. The additional pressure relief valve is used for adjustment and the pressure gauge reads the value when observing the pressure gauge

The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

Product survey.Secondly, for the replacement of hydraulic oil on the lifting platform, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

The quality of the standard section should comply with the product manual and specification requirements.

The landing door should meet the requirements of the specifications and achieve standardization.


Nai meihengElectric hydraulic platform elevatorHow to reduce the failure



It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

The working principle of the aluminum alloy lifting platform is that hydraulic oil is composed of a vane pump to form a certain pressure, which enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve

Secondly, for the replacement of hydraulic oil on the lifting platform,Nai meiheng10 meter electric lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean,Nai meihengMicro electric elevator, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

Nai meiheng.From the above comparison,Nai meihengScissor fork electric lifting table, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.