SilversonAluminum alloy lifting rodHigh bearing capacity

announcer:hp750HP120486450 release time:2023-11-13 14:23:34

Firstly, unstable voltage can easily burn out various electrical components inside the operation box,SilversonFour pillar aluminum alloy elevator, making the equipment unable to receive signals.

After 1500 hours of operation of the elevator minor repairs will be carried out to the mechanical and electrical systems. Professional aluminum alloy elevator manufacturer is safe, environmentally friendly, and economical! Our products are exported to foreign countries and highly trusted

Silverson.The main lifting mast adopts high-strength aluminum alloy profiles, which have high safety and light overall weight.

Secondly, frequent voltage instability can directly burn out the power unit motor. The consequences of motor burning are very serious, which can lead to an instant decrease in pressure. If the equipment is not equipped with safety devices such as relief valves or explosion-proof valves, it can cause the lifting equipment to fall, leading to accidents. At the same time, replacing a new power unit also requires a certain cost.

.Users can choose the power mode and configuration according to their usage range: the power system includes: DC power supply, single-phase or three-phase power supply,SilversonAluminum alloy mobile elevator, diesel engine. Walking: assisted self-propelled, two wheel traction, self driving, and car modification. Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranked outriggers, and pull-out outriggers. System: explosion-proof electronic control system, remote control system PIC system. Hydraulic pump station: domestic lifting platform dedicated pump station, imported pump station from Italy with external protective devices: organ cover type, mesh type, and iron plate sealed type.

Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated.

Hydraulic aluminum alloy elevators operate up and down, and can provide us with a safe and stable platform. We can provide security for our safety when working at heights.


SilversonAluminum alloy lifting rodHigh bearing capacity



The standard rack free design of the lifting and lowering machine with high safety performance ensures that the platform will not fall, and the limit and limit switches further ensure the safety of construction personnel.

  

The main components of the Hunter hydraulic fixed elevator are: 1. The shaft part is a closed or mesh frame enclosed by buildings or lightweight steel structures, with steel guide rails installed on both sides of the interior. 2. The driving part is equipped with a hydraulic drive motor, oil pump, and safety valve, A small oil tank for hydraulic components such as speed control valves and directional valves: 3. The oil cylinder part: It is composed of one or more oil cylinders of the lifting oil cylinder straight top platform or lifting shear fork frame: 4. The door system part: It is a closed or mesh platform door or landing door system composed of steel structure, with manual and automatic doors. Generally, open platforms do not have doors. 5. The electrical part: It includes power, signal, Composition of safety and lighting devices: 6 Platform parts: It is a steel structure platform that carries heavy objects, with guide rollers or guide shoes installed on both sides. The bottom of the platform can be connected to a lifting oil cylinder or a lifting shear fork shaped steel frame. When we use aluminum alloy elevators, we need to regularly inspect, maintain, and maintain them, which can not only extend the service life of the aluminum alloy elevator, Can make it work with greater power! For example, the transmission part should have sufficient oil, and vulnerable parts must be regularly inspected, repaired, or replaced. Mechanical bolts especially parts that frequently vibrate, such as slewing bearings and lifting arm connecting bolts, should be checked for looseness. If there is looseness, it must be tightened or replaced immediately. Next, let's take a look at the regulations for the maintenance time of aluminum alloy elevators: daily maintenance (carried out per shift).

original.. Before the maintenance of the hydraulic aluminum alloy elevator starts, the tools used must be counted. After the maintenance is completed, the tools should be classified and organized, and counted to prevent the tools used for maintenance from being left inside the equipment, especially in the distribution box. When repairing the hydraulic system of the aluminum alloy elevator, it is necessary to keep the maintenance site clean and dust-free. When repairing and fastening screws for aluminum alloy elevators, it is necessary to use the correct diagonal first. When tightening screws, use a torque wrench to prevent excessive damage to the screws. After the maintenance is completed and before the power on test, it is necessary to count the number of maintenance personnel to ensure that there is no one inside the aluminum alloy elevator. This is very necessary for the maintenance of large fixed hydraulic elevators. After counting the number of people, the power transmission test can only be carried out. After the maintenance of the aluminum alloy elevator is completed, the equipment maintenance record must be filled out. The maintenance record should include the equipment maintenance date, the maintenance items, the brand model and specification of the replaced parts, the effectiveness of the maintenance, the maintenance process should be carried out on the premise of ensuring the safety of staff. Before repairing the aluminum alloy elevator, the power must be disconnected, and the power must be verified and hung up; No power transmission, people working&# quo; Identification plate for. During the maintenance process, it is not allowed to disconnect the grounding wire of the aluminum alloy elevator. If it is necessary for maintenance work, after the maintenance is completed, the grounding wire must be connected before the power test can be conducted. When replacing spare parts for aluminum alloy elevators, it is necessary to ensure that the spare parts are intact and of the same model. Items such as valves and seals should be placed in dry and dust-free packaging. When hydraulic aluminum alloy elevator maintenance requires entering the platform for internal work, after the aluminum alloy elevator is lifted,SilversonMobile aluminum alloy elevator, the working surface of the aluminum alloy elevator must be fixed or supported firmly with a crane or other equipment,

Machine manufacturers and other related businesses. Merchants with this business are welcome


SilversonAluminum alloy lifting rodHigh bearing capacity



It is strictly prohibited to damage the elevator. Brake fluid has a damaging effect on the paint film of aluminum alloy elevators. It can quickly dissolve the paint film. Simultaneously. Brake fluid is also harmful to the eyes. It is reminded that if it splashes into the eyes, it must be immediately rinsed with clean water.

Production department.The aluminum alloy elevator with strong controllable performance is easy to operate and has high accuracy, which can meet the different needs of different heights, that is, press and stop, making high-altitude operations simple and feasible.

Or during trial operation if the motor overheats, it should be stopped immediately, and then the fault that caused the motor to overheat should be checked and eliminated in order to continue using the machine.

Hydraulic lifting platforms can be divided into: four wheel mobile, two wheel traction, car modification, auxiliary self-propelled, and lifting heights ranging from 4 meters to 18 meters. This series of products has a load capacity of 0.1 to 0.8 tons, and can also be customized according to user requirements, with a high load capacity of up to 10 tons.

Silverson.It is strictly prohibited to run the engine for a long time in a closed garage. The exhaust gas of the aluminum alloy elevator engine contains carbon monoxide. This is a toxic gas that has been in low concentration for a long time

Method: Check the length or diameter of the power supply lead. When the wire length is not more than 25 meters, the wire diameter should not be less than 1m ²; When the wire length is not greater than 50 meters, good stability, flexible operation, large platform area, and convenient implementation, and can exert high lifting capacity in a very small space.