AachenElectric single arm elevatorImport substitution process

announcer:hp935HP175192871 release time:2024-03-13 09:30:38

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

Aachen.Construction electric elevators should be equipped with upper limit switches that are sensitive and reliable.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

.The wall bracket of the construction electric elevator should be intact and reliably fixed and its attachment distance,AachenElectric hoist, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.


AachenElectric single arm elevatorImport substitution process



In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, and a toe board at least 150mm above the ground.

The working principle of the aluminum alloy lifting platform is that hydraulic oil is composed of a vane pump to form a certain pressure, which enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve,AachenSmall electric elevator, hydraulic control one-way valve,AachenElectric chain elevator, and balance valve

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Bidding.The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Remind customers that there are still many areas to pay attention to when maintaining and maintaining the lifting platform. We also hope that customers and friends can pay more attention when using it to ensure the safety of personnel and property, regularly maintain and extend its service life, and create greater benefits for the enterprise. What is the matching degree of electric elevators? Everyone has always been confused. In short, the matching degree of electric elevators is how the height of the electric elevator can be combined with the operating height. Electric elevators are not used frequently, so we must make it clear based on the actual operating height and actual load capacity when using electric elevators. If the frequency is too high, We suggest considering purchasing a guide rail electric elevator or a scissor fork electric elevator. The scissor fork electric elevator can achieve a maximum load capacity of 100 tons, which effectively solves the problem of load capacity. If the frequency of use is too high and the height is relatively high, we recommend using a guide rail electric elevator. This type of electric elevator is not easy to malfunction under high-frequency operation, By solving the load capacity and frequency of use, the matching problem of electric elevators is effectively solved. Concept of electric elevator rotary valve: The electric elevator rotary valve is a type of valve that quickly opens and closes, and the rotary valve can reduce oil pipeline channels and optimize line settings.


AachenElectric single arm elevatorImport substitution process



Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

Customer first.The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

The pressure joint between the pipe joint and the rubber hose fails prematurely, causing oil leakage or pipe explosion. The oil temperature rises due to frequent action of the overflow valve.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

Aachen.The hydraulic oil forms a certain pressure by the vane pump, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor) causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, and

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.