AbquikiAluminum alloy electric elevatorInvestment Information

announcer:hp935HP175192871 release time:2024-05-02 09:44:43

the form of the stage can be changed. For example

According to the needs of different performance genres, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage,AbquikiTatami electric elevator, a T-shaped stage, or a hall.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

Abquiki.A lifting platform with specifications ranging in height from 1 meter to 20 meters.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods,AbquikiFully automatic elevator electric, the operating failure rate can be reduced to a low level.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.


AbquikiAluminum alloy electric elevatorInvestment Information



The setting of the cable guide frame should comply with the user manual and regulatory requirements.

And prevent it from starting normally. There should be no device that allows users to cancel warning signals.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged,AbquikiHand push electric elevator, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

demand.Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.


AbquikiAluminum alloy electric elevatorInvestment Information



The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station and the landing doors should function properly.

How many?.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Greater than 0.04s; When the hydraulic buffer is used, the oil level shall be checked, and the action of the hydraulic buffer shall be monitored by the Electrical safety switch. When the hydraulic buffer is compressed, the cage shall not

Stage equipment safety door. To prevent personnel from extending their heads, hands, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

Abquiki.The verticality of the guide rail frame should meet the requirements of the specifications.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

The scaffolding of the parking platform should be laid tightly and firmly.