Munich Lim AirportElectric hydraulic elevator platformWhat is the packaging method

announcer:hp935HP175192871 release time:2024-02-11 12:22:08

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Construction electric elevators outside the lightning protection range

Munich Lim Airport.Folding arm electric elevators are mostly driven by hydraulic means,Munich Lim AirportSmall electric elevator platform, and the source of power for the hydraulic system is hydraulic oil. Only when the hydraulic oil quantity is sufficient and the oil quality is high, can the folding arm electric elevator provide greater torque output, thereby improving work efficiency. So, how can we determine whether the newly added hydraulic oil quantity is sufficient? What is the hydraulic oil quantity standard?

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

.The scaffolding of the parking platform should be laid tightly and firmly.

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.


Munich Lim AirportElectric hydraulic elevator platformWhat is the packaging method



The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

The usual operation of landing and docking. The installation position of the upper limit switch should comply with the following: when the lifting speed is less than 0.8m/s, the upper safety distance L left after the upper limit switch is triggered by the hanging cage should not be less than

Stage equipment safety door. To prevent personnel from extending their heads,Munich Lim AirportOutdoor electric lifting platform, hands,Munich Lim AirportUsed electric elevator, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

assets.Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.


Munich Lim AirportElectric hydraulic elevator platformWhat is the packaging method



According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage a T-shaped stage, or a hall.

Economic management.Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

The upward movement of the hydraulic cylinder involves lifting heavy objects, and the return oil from the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve. The additional pressure relief valve is used for adjustment, and the pressure gauge reads the value when observing the pressure gauge

Use floor doors and cage door devices on construction sites where conditions permit.

Munich Lim Airport.The use of a lifting platform as a tool for storing performance blankets, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, etc.

Installation and dismantling personnel and drivers should hold certificates to work.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.