SwatpskSmall elevator for restaurantsSupply reduction is deterministic

announcer:hp323HP155335083 release time:2023-12-19 13:08:34

if not properly operated, there will always be problems. Many customers have reported that hydraulic elevators sometimes cannot be lifted. If the hydraulic lift pump can continue to work,SwatpskConstruction site elevator, other issues need to be considered. Below, the editor will explain the reasons for the hydraulic lift pump station not being oiled and solve the reasons for the hydraulic lift pump station not being oiled, as well as the solutions for mobile elevators The analysis of the pump station of hydraulic elevators such as guide rail elevators is as follows: the motor power supply is abnormal or reversed; The solution is to correctly connect the motor power supply or adjust the steering mailbox to ensure there is no hydraulic oil or insufficient oil; The solution is to add hydraulic oil.

High altitude work is now also very common, and elevators are also highly demanded by the market. Many high-rise transportation tasks are completed by elevators, with high efficiency and reassuring safety. However, attention should also be paid to the installation of the elevator, otherwise there may be problems, and no one wants to see such a situation happen. What are the installation precautions for elevators?

Swatpsk.Prepare the foundation according to the basic plan, pay attention to finding, leveling, and aligning points, and ensure the level of the foundation and various usage requirements.

Install two more standard sections. Check and adjust the verticality of the guide rail frame with a theodolite to ensure that the error in two mutually perpendicular directions meets the requirements of Table 1. The above two parts are about the installation precautions for the elevator. If your work involves operating or installing the elevator, everyone must pay attention to safety.

.1: The rust on the spiral elevator is caused by some manufacturers' materials not being stainless steel. If rust is not severe, sandpaper can be used to polish and remove the rust. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

Systems: explosion-proof electronic control system, remote control system, and PIC system. Professional elevator manufacturers have stable, safe, reliable performance,SwatpskSingle mast elevator, and can achieve maintenance free. Their technical level has reached the domestic level and reached the advanced level of similar international products

Single column aluminum alloy elevator with easily recognizable operation panel, multiple mechanical, electrical, and hydraulic safety protection, and advanced integrated hydraulic electricity


SwatpskSmall elevator for restaurantsSupply reduction is deterministic



Four column aluminum alloy elevator: the whole elevator is made of high-strength aluminum profiles. Due to the high strength of the profiles the four mast structure is adopted, which has excellent stability, flexible operation large load capacity, large platform area and convenient implementation. Its appearance allows for high lifting capacity in extremely small spaces. Minimize the deflection of the lifting platform.

The double column aluminum alloy lifting platform is designed with beautiful and generous appearance, and is made of high-strength aluminum alloy material. It has a large load-bearing capacity, usually ranging from 6-14 meters in height, and can carry a load of 150-300 kilograms. Large countertop design allows for one to two people to work simultaneously.

Single column aluminum alloy elevator with easily recognizable operation panel, multiple mechanical, electrical, and hydraulic safety protection, and advanced integrated hydraulic electricity

details.The normally closed valve and motor are energized simultaneously; The solution is correct wiring, and the motor often closes the valve and loses power when powered on.

Walking: assisted self-propelled, two wheel traction, self driving, and car modification.

High altitude work is now also very common, and elevators are also highly demanded by the market. Many high-rise transportation tasks are completed by elevators, with high efficiency and reassuring safety. However attention should also be paid to the installation of the elevator, otherwise there may be problems, and no one wants to see such a situation happen. What are the installation precautions for elevators?


SwatpskSmall elevator for restaurantsSupply reduction is deterministic



1: The rust on the spiral elevator is caused by some manufacturers' materials not being stainless steel. If rust is not severe,SwatpskWorkshop cargo elevator elevator, and new and old customers are welcome to come for consultation

Standard requirements.What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

The equipment operation is very simple, just press the operation button, and the height adjustment board of the equipment will automatically rise; Release the button, adjust the weight of the plate to fall, and the tongue plate can be used by placing it on the truck.

4: Small scale pneumatic or electric rust removal is based on the principle of using air compression to generate friction or electromagnetic effects to polish and remove rust on the surface of spiral elevators. It can be used for precision instrument push rods or for enterprises that require micro operation of spiral elevators.

Swatpsk.The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Loose or leaking connection between the oil suction pipe and the gear pump; The solution is to tighten the suction pipe.