AbquikiGuide rail hydraulic lifting platformProblems encountered and solutions

announcer:hp695HP135175170 release time:2023-08-14 22:35:37

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, or safety belts or ropes should be used.

The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

.For the safety performance of high-altitude work platforms, it is necessary to have production technology, scientific processes, and strict management to ensure production. When in use people, the environment, and machines are the three major links of high-altitude operations,AbquikiHydraulic lifting platform,AbquikiLifting platform hydraulic station, and safety is the basic condition to ensure the smooth progress of high-altitude operations. In the following text, Jiuyi briefly describes the precautions for using high-altitude operation platforms: high-altitude operators must hold a health certificate. Individuals suffering from intentional, high-pressure, or mental illness are not allowed to engage in high-altitude work tasks. Staff are not allowed to engage in high-altitude work while drinking alcohol or feeling mentally drained.

The power unit adjustment, whether it is a scissor type lifting platform or a guide rail type lifting cargo elevator, is composed of the power unit and the oil cylinder. The power unit has four outlets during production, which can be adjusted to increase or decrease the hydraulic oil flow rate of the oil cylinder. We can adjust the motor speed or the electro-hydraulic proportional valve to adjust the hydraulic oil flow rate; What factors will affect the lifting speed of hydraulic elevators? The longer the hydraulic oil pipe, the longer the lifting time. Therefore, during installation, the length of the oil pipe should be minimized as much as possible within the allowable range of the design; On the basis of adjusting the power unit, the size of the oil pipeline can also be adjusted, and corresponding adjustments can be made while ensuring that the equipment meets normal demand and safety.

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.


AbquikiGuide rail hydraulic lifting platformProblems encountered and solutions



The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

If the lowering valve is not tightly sealed, check if the lowering valve has electricity. If there is electricity, eliminate the malfunction of the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

The power unit adjustment,Abquiki10 meter hydraulic lifting platform, whether it is a scissor type lifting platform or a guide rail type lifting cargo elevator, is composed of the power unit and the oil cylinder. The power unit has four outlets during production, which can be adjusted to increase or decrease the hydraulic oil flow rate of the oil cylinder. We can adjust the motor speed or the electro-hydraulic proportional valve to adjust the hydraulic oil flow rate; What factors will affect the lifting speed of hydraulic elevators? The longer the hydraulic oil pipe, the longer the lifting time. Therefore, during installation, the length of the oil pipe should be minimized as much as possible within the allowable range of the design; On the basis of adjusting the power unit, the size of the oil pipeline can also be adjusted and corresponding adjustments can be made while ensuring that the equipment meets normal demand and safety.

superior quality.Loosening: The motor fan makes a sound when it rotates. If the screws that fix the motor are loose, coupled with its own vibration, lacking oil, and there is hard friction between the iron parts, which not only damages the components but also produces abnormal noises. Therefore, the editor should emphasize again that timely maintenance and frequent refueling are important; If the hydraulic lifting platform does not rise, there is air in the hydraulic oil. You can open the exhaust hole, add gas, and then tighten it again; Hydraulic oil solidification: replace the hydraulic oil; Oil leakage: Check if there is any oil leakage at the interfaces of each oil pipe. If there is any oil leakage, replace it in a timely manner; Motor reversal: Check for wiring errors; (Manufacturers of hydraulic lifting platforms who do not understand electricity in a timely manner)

Although lifting cargo elevators have good safety, in practical work, if we do not pay attention to detailed maintenance, accidents may occur. Therefore, we should pay attention to them when performing daily maintenance.

Before using the machine, the staff should carefully inspect the hydraulic and electrical systems to ensure that there are no leaks or bare leaks before use.


AbquikiGuide rail hydraulic lifting platformProblems encountered and solutions



When encountering overheating in the electric motor during daily maintenance of the elevator, it is necessary to quickly park the car, remove obstacles, and then continue running. The motor bearings should be smooth and excellent.

Quality improvement.When personnel enter the interior of the lifting platform for maintenance of outdoor elevators, they must hang the elevator to prevent sudden lowering of the platform and causing casualties.

Loose or leaking connection between the oil suction pipe and the gear pump; The solution is to tighten the suction pipe.

The contact opening and closing of the travel switch of each safety device must be reliable, and the contact crater should be polished in a timely manner.

Abquiki.Remove and disassemble the hydraulic lift cargo elevator lowering valve blow out the plunger with compressed air, then install it and reinstall it.

The lifting platform has been inspected and debugged before leaving the factory, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.

According to Beijing regulations, the arrival time is within 30 minutes.