When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.

Sound, causing short circuit obstruction. If not handled properly it will cause great damage.

St Pierre.Visual inspection method for transformer inspection

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment,St PierreDistribution transformer maintenance, the output capacity can be increased by 20%.

The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong,St PierreBidding information of power transformer, so that the bolts are not tightened well, resulting in oil leakage.

Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, tunnel construction, chemical enterprises and factories.


St PierreCommercial power transformerHow to solve the problem when there is a problem



The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.

The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT100 temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as 420mA analog quantity. If it is to be far away (the distance can reach 1200m, the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter, and 31 transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt100 thermistor sensor, so as to further improve the stability of the temperature maintenance system software.

When the transformer is out of phase, if the second phase is blocked, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

Interpretation and observation.The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.

In the electric field of the winding to the yoke there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

Method and process of taking oil sample of power transformer


St PierreCommercial power transformerHow to solve the problem when there is a problem



Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

Executive standard.The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.

After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

St Pierre.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

When checking the hook core, if you work again, turn on the photo flash when it's light, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance,St PierreRecycling of waste box type transformer, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.