RukungiriPower transformer rankingMany factors restrict the price, and there is still the possibility of repetition

announcer:hp122HP117294921 release time:2024-05-05 16:21:31

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

Rukungiri.In order to promote the use of energy-saving transformers, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as 2012 providing subsidies of 4-30 yuan / KVA for energy-saving transformers.

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,

Oil leakage of bolt or pipe external thread


RukungiriPower transformer rankingMany factors restrict the price, and there is still the possibility of repetition



Sound in case of phase failure

For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition, the oil with the same basic, there is generally no problem. However, if there is more new remaining oil, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.

The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

Home page recommendation.Causes of fire in power transformer

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

Therefore,Rukungiri630kVA dry type transformer, in the installation process of substation equipment the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.


RukungiriPower transformer rankingMany factors restrict the price, and there is still the possibility of repetition



Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.

Development Curriculum.(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

Transformer inspection nose sniffing method

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil,Rukungiri10kV dry type power transformer, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

Rukungiri.Noise dispersion of dry-type transformer

Difference between dry-type transformer and oil immersed transformer:

Under normal conditions, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.