The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

brooklyn.Setting requirements: Buffers should be installed below the suspension cage and counterweight running channel.

The setting of the cable guide frame should comply with the user manual and regulatory requirements.

.When the wall bracket adopts non matching standard products, design calculations should be carried out.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.


brooklyn2 ton electric elevatorHow to divide the product surface processing grade



Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, if

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

target.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, or other lower suspended structures floors the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.


brooklyn2 ton electric elevatorHow to divide the product surface processing grade



Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

Honest service.With the continuous improvement of urbanization level in China,brooklynSmall car electric elevator, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

If the set screw is loose, be sure to pin it tightly to prevent accidents caused by the shaft pin falling off. Hydraulic oil should be kept clean and replaced every 6 months.

After the electric elevator passes the inspection, installation unit and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

brooklyn.To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue,brooklynElevator electric platform, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.