MunichGuide rail elevatorWhat are needed in quality inspection

announcer:hp695HP135175170 release time:2024-04-15 11:16:57

The surface of each part of the brush should be kept clean, and the brush pressure should be adjusted to ensure that its area is not less than 50%. Specializing in product and renewable resource business, including: scissor lift manufacturers

Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.

Munich.Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform force, please first screw on the installation bolts at any diagonal position but do not tighten them. Then, screw on the installation bolts at the other two diagonal positions and tighten the four installation bolts one by one. Afterwards, with a wide operating range and high load-bearing capacity, making high-altitude operations increasingly large-scale and supporting multiple people working together. It makes high-altitude operations more powerful and safe. It is a widely used high

Working at heights is a common practice nowadays, but it also has a certain degree of danger. So people invented hydraulic lifting platforms, which are more convenient to help people complete high-altitude operations. However, people should also pay attention when using hydraulic lifting platforms, otherwise they can easily malfunction, and then reinstall it.

The second is that the steel will have obvious thermal expansion effect at low temperature. Although this property of steel will be taken into account when designing and manufacturing hydraulic elevators blow the valve core clean with compressed air, the environment is different after all. Under low conditions, the steel will have some unstable performance,MunichMobile hydraulic lifting platform/lifting platform, such as hardness increase, toughness decline, etc. At this time, more attention should be paid to the maintenance of equipment to keep key parts to avoid dry grinding.

Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.


MunichGuide rail elevatorWhat are needed in quality inspection



The boxes and distribution boxes of hydraulic elevators should be kept clean regularly,MunichVehicle mounted hydraulic lifting platform, and dust on electrical equipment should be promptly cleaned.

The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.

Motor does not rotate: The motor is broken, and the manufacturer will handle it. We are a long-term manufacturer of scissor type elevators. Welcome to inquire

Welcome calls .Avoid, especially during storage. Store in a cool and dry place, and avoid rainy and snowy weather during work.

The main structure and purpose of a guide rail elevator: The mechanical part of a guide rail elevator mainly includes three parts: a lifting device, a track device, and a belt changing device. The lifting device is mainly used to suspend the person being lifted, which is the core part of the entire mechanism. The track device is mainly used to provide movement trajectory, making operation more smooth. The belt changing device is used to switch tracks when the elevator is about to pass through a door. The internal structure of the lifting device is mainly composed of gear mechanism, bracket, worm gear, guide mechanism, lifting arm, upper and lower shells, etc. The gear mechanism mainly includes large and small gears, winding pulleys, central shafts, and safety devices composed of stop buckles and torsion springs.

The explanation mainly focuses on the mechanism of lifting platforms, and now there are many different types of lifting platforms. In order to better use lifting platforms, we have started to develop different industries using different lifting platforms. Electric lifting platforms have become the main product of small lifting platforms. They are small in size, light in weight, practical in appearance, stable and free in lifting, large in load capacity, and large in plane area, Stability has become a machinery that many customers are competing for and lifting equipment is used in enterprises of all sizes, so the use of lifting platforms is necessary.


MunichGuide rail elevatorWhat are needed in quality inspection



What are the pressures on lifting platforms? The movement of lifting platforms has always been a concern for us. Our usage scenarios are uncertain, and most of them are part-time workers. Therefore, in order to better attract customers, we are constantly researching mobile lifting platforms to meet different needs. However, for some large logistics or enterprise processing plants, we are still accustomed to using fixed elevators, He has a huge load capacity and strong stability, which can meet the needs of many customers, which is also the use of lifting platforms in China in recent years.

knowledge.The pressure of the lifting platform is very important. When lifting goods, the pressure of the lifting platform will test the weight of the goods. If it is overloaded, the general lifting platform will prompt which serves as protection. Therefore, now lifting platforms are equipped with pressure gauges. Hydraulic machinery should remind everyone to pay attention to the following points: the precautions for using small lifting platforms are based on pressure. Their load-bearing capacity is very poor and their size is small. When using the lifting platform, it is necessary to pay attention to its use. If overloaded, it is necessary to establish a mechanical management responsibility system; It is necessary to develop maintenance procedures for different models; Corresponding maintenance institutions must be implemented; It is necessary to handle the relationship between maintenance and production, so as not to affect production or equipment maintenance.

The lifting platform has been inspected and debugged before leaving the factory, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.

Munich.Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

When installing, disassembling, and adjusting the rotating mechanism, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear, the switch box also has leakage protection equipment, and its wires and cables have good insulation without leakage. The metal passing through the wires is not rusted, and its damage is close to zero. His steel wire rope should comply with the corresponding configuration requirements, without any issues of strand breakage or shrinkage, and of course, the number of broken wires should not exceed the corresponding standards. His pulley movement is very flexible.