AlmavitWhich is a good oil immersed power transformerHow to deal with failures

announcer:hp122HP117294921 release time:2024-04-14 13:02:55

Careless maintenance and insulation damage

Difference between dry-type transformer and oil immersed transformer:

Almavit.Transformer inspection ear

Noise pollution control and prevention measures of dry-type transformer

.The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way,AlmavitOil immersed regulator manufacturer, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?

After no-load test run is normal for 24h, it can be transferred to on-load operation and the load shall be gradually increased from 25%, 50% and 75% by grade.

Power transformer factory


AlmavitWhich is a good oil immersed power transformerHow to deal with failures



Different diversion methods dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, which shall not exceed 2% compared with the last accurate measurement result.

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, there are empty welding, open welding,AlmavitTransformer power transmission, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition,AlmavitTransformer 10KV, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out and then Fushi blue raw materials shall be selected for sealing treatment.


AlmavitWhich is a good oil immersed power transformerHow to deal with failures



In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.

Industry management.Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.

The flange surface is uneven, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

Almavit.The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

Dry type transformer