Berlin1250 dry type transformer sizeTips for cleaning

announcer:hp122HP117294921 release time:2024-02-25 11:57:35

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

Oil leakage of porcelain pot and laminated glass oil level gauge

Berlin.The proper selection of Anhui dry-type transformer has a key effect on improving the safety and smooth operation of power system software. In the above original text, we have already mastered the structure and characteristics of dry-type transformer. In this part, we will describe how to select dry-type transformer according to the load characteristics and application environment of dry-type transformer.

Due to careless transportation of the transformer and the thin high-voltage conductor, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power,BerlinS9 oil immersed transformer, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.


Berlin1250 dry type transformer sizeTips for cleaning



The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat, temperature rise,BerlinSpecification and model of power supply transformer, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.

Precautions for trial operation of power transformer manufacturers

The dry-type transformer is composed of two winding resistances, resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D Y & rdquo;, & ldquo; y, D & rdquo; and & ldquo; D, D & rdquo;. In China, Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn0 wiring group, when UAB and UAB overlap, the minute hand points to 12. & ldquo; 12 & rdquo; in the new wiring group, it is indicated by & ldquo; 0 & rdquo.

project.High voltage fuse of transformer breaks one phase;

The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition the electromagnetic induction vibration will crack the electric welding and lead to leakage.

The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.


Berlin1250 dry type transformer sizeTips for cleaning



Noise solution of dry-type transformer

Inspection items.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

According to statistics, to occupy the main global technical position, the transformer industry depends on two key data, commodity volume and voltage level. As early as & ldquo; Eleventh Five Year Plan; In the early stage, China has been a powerful country in the production, manufacturing and application of dry-type transformers all over the world,BerlinPicture of power transformer, but it is not a big country.

How much is the power transformer

Berlin.Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

Power transformer factory

Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.