Nai meiheng8 meter mobile elevatorHow to train operators

announcer:hp323HP155335083 release time:2024-05-02 11:59:26

Reset the brake; Installation and maintenance section. The maintenance section is generally installed in the fourth section. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

Reset the brake; Installation and maintenance section. The maintenance section is generally installed in the fourth section. Long term promotion of downgrading manufacturers, 20 year old brand with price advantages and guaranteed quality!

Nai meiheng.Loosening: The newly processed and assembled components of high-altitude work platform equipment such as mobile elevators have a tendency to have geometric shapes and matching dimensions. In the early stages of equipment use, due to the influence of alternating loads such as impact and vibration, or factors such as heat and deformation, coupled with rapid wear and tear, mast hydraulic elevators, and straight arm hydraulic elevators according to their working modes. Hydraulic elevator is a replacement product of folding arm elevator (lifting platform) and scissor fork elevator (lifting platform). It can be widely used for the decoration and decoration of stations, docks airports, hotels, posts and telecommunications, garages, cleaning companies, public building facades, or the installation and maintenance of power systems, etc. This elevator has the advantages of light weight, self-propelled walking, electric starting, self supporting legs, simple operation, large working area, and especially the ability to cross obstacles for high-altitude operations.

4: Small scale pneumatic or electric rust removal is based on the principle of using air compression to generate friction or electromagnetic effects to polish and remove rust on the surface of spiral elevators. It can be used for precision instrument push rods or for enterprises that require micro operation of spiral elevators.

The purpose of the hydraulic lifting platform allows users to choose the power mode and configuration according to their own usage range: the power system includes: DC power supply, single-phase or three-phase power supply, diesel engine.


Nai meiheng8 meter mobile elevatorHow to train operators



Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

The rust prevention work of aerial work vehicles is generally something that needs to be paid attention to when they have not been used for a long time. How should we do anti-corrosion on the body of aerial work vehicles? This is actually a simple matter of not having to spend money on anti-corrosion at the repair station. As long as we car owners use some materials they can find on their own, we can achieve this. At the same time, paying attention to driving habits can ensure that high-altitude work vehicles do not rust. Here are a few points for reference.

Many people believe that the mechanical strength of the elevator itself is relatively high when using it, so during the installation process, there is no

Test results.The method is that it may cause increased wear and inflexibility of the parts, and it is also important to pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to strictly follow the installation and use related matters below, and carefully assemble and use it.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Emergency bolts not tightened; The solution is to tighten the emergency valve.


Nai meiheng8 meter mobile elevatorHow to train operators



The power unit adjustment, whether it is a scissor type lifting platform or a guide rail type lifting cargo elevator, is composed of the power unit and the oil cylinder. The power unit has four outlets during production, which can be adjusted to increase or decrease the hydraulic oil flow rate of the oil cylinder. We can adjust the motor speed or the electro-hydraulic proportional valve to adjust the hydraulic oil flow rate; What factors will affect the lifting speed of hydraulic elevators? The longer the hydraulic oil pipe, the longer the lifting time. Therefore, during installation, the length of the oil pipe should be minimized as much as possible within the allowable range of the design; On the basis of adjusting the power unit, the size of the oil pipeline can also be adjusted, and corresponding adjustments can be made while ensuring that the equipment meets normal demand and safety.

Workshop cost.The load capacity of goods and the tonnage of goods transported at once also affect the speed of lifting and lowering. Achieving the excellent value of the lifting platform for transporting goods is a guarantee of speed. If the weight is too heavy, it affects the speed. If the goods are too light, it also affects the normal transportation time.

How to use a hydraulic elevator and whether the emergency stop device is effective is very important during use. If special circumstances arise,Nai meihengBuilding elevator, the emergency stop can be used. Therefore, before use, it is necessary to carefully check whether all items are normal and ensure the effectiveness of the braking device.

The normally closed valve and motor are energized simultaneously; The solution is correct wiring, and the motor often closes the valve and loses power when powered on.

Nai meiheng.High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

According to different needs,Nai meihengElevator to the second floor, different power modes can be selected such as three-phase AC power supply, single-phase AC power supply, DC power supply, and internal combustion power supply. With manual hydraulic equipment, lifting operations can be carried out in places with power outages or no power supply, and components can be added. When the platform length is insufficient, it can be extended to the required direction,Nai meiheng100kg small elevator, and then the operating power can be increased. It is a must-have product of modern large-scale construction and equipment, and a necessity for high-altitude safety and civilized production.

Welcome from home, able to easily deliver goods to high-rise buildings. Among them, and people can choose the one that suits them according to their actual situation. However, during normal work, it is important to pay attention to the lifting speed of hydraulic elevators and avoid making mistakes. So what factors will affect the lifting speed of hydraulic elevators?