ShijingshanTaibian boarding bridgeHow to perform preventive maintenance

announcer:hp258HP138990173 release time:2024-05-06 18:42:30

High strength& quot; U& quot; The design of the shaped beam can ensure its high load and long-term operation without deformation.

Using a hand operated hydraulic pump as power, and low maintenance costs. Suitable for various vehicles on loading and unloading sites and places with relatively busy traffic has strong stability, the boarding bridge is composed of mechanical systems, hydraulic systems, and electrical systems. Fully hydraulic drive, easy to operate and reliable to operate. The lip plate is connected to the platform using a full length shaft, which has high strength and good reliability. The use of imported seals ensures excellent sealing performance of the hydraulic system. Adopting imported integrated modular hydraulic station, with good sealing performance and long service life. Monthly maintenance of the landing bridge of the lifting platform. The landing bridge, like other handling tools, also needs regular maintenance in the future. Regular maintenance will appropriately extend the use of the landing bridge. Once the hydraulic oil becomes dark, sticky or has sand and gravel and other foreign matters, it should be replaced in a timely manner; Each part should be filled with some oil separately, which can extend the service life of the bearing.

.The fixed hydraulic boarding bridge has three fundamental elements: purification, overheating,ShijingshanCustomized mobile hydraulic boarding bridge, and air intake. There is a close internal connection between these three unfavorable factors, and any one of them will result in one or more achievements. Theoretical proof shows that 75% of the reasons for fixed hydraulic boarding bridges are caused by these three factors.

A one line boarding bridge suitable for special heavy-duty vehicles in special situations. If all the wheels of any multi axle vehicle are rigidly suspended on the frame of the trailer, it cannot be guaranteed that all the wheels will be suspended from the ground at the same time when driving on harsh roads, resulting in accidents such as wheel suspension and serious vehicle body accidents. It seriously affects the driving smoothness and handling stability of the vehicle. The use of a one line, two axle boarding bridge can ensure that all wheels have good contact with the road surface when driving on harsh road conditions, thereby reducing accidents such as vehicle body and improving vehicle driving smoothness and handling stability. The self steering boarding bridge is designed based on the principle of adjusting and stabilizing steering according to different loads. The hydraulic boarding axle beam and the steering pin fluctuation pressure bearing are connected together. When the vehicle is traveling in a straight line, the mass of the vehicle itself causes the upper and lower wavy pressure plates to mesh closely with each other, thereby maintaining the straight running state of the wheels. Whenever a semi trailer turns, the wavy tooth surface of the pressure bearing is misaligned, raising the axle beam and causing the wheels to automatically turn. The frictional resistance between the two pressure blocks also needs to undergo corresponding changes depending on the load on the boarding bridge. In addition, according to different loads, the steering angle limiter can automatically increase the steering angle. At the same time, the steering tie rod also causes the instantaneous center of rotation of two wheels to coincide. The anti slip device of the boarding bridge is welded with steel plates, safe and reliable. Anti collision blocks can effectively protect buildings and boarding bridges from damage. It is made of highly resistant reinforced rubber. The four outer corners of the anti-collision block are all arc-shaped and all bolt holes are deeply embedded inside. Bolt hole size is Ф The anchor bolt mounting bridge for M20 assembly is composed of a mechanical system, a hydraulic system, and an electrical system. The platform and chassis form a mechanical system. Elevating the platform to; U” Shaped steel as the skeleton with light self weight and large bearing capacity; The countertop is made of anti slip patterned steel plates and has a high load-bearing capacity; The countertop is made of anti slip patterned steel plates, improving work reliability.

Fixed loading and unloading bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles to move and load goods in batches inside the truck. With only one person working, fast loading and unloading of goods can be achieved. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.


ShijingshanTaibian boarding bridgeHow to perform preventive maintenance



The rear folding transition plate and forklift traction hook can easily move the boarding bridge. A layer of toothed anti-skid plates or checkered plates is laid on top of the bridge body. The mesh is twisted and hollow, but also prevents the accumulation of grease,ShijingshanFixed hydraulic boarding bridge, rainwater, and ice and snow. This equipment is particularly suitable for explosion-proof and flammable places, with manual hydraulic power, without generating sparks and no worries. The power can be configured as: manual hand pump power. Electric power. Ensure that the oil cylinder is processed by iron cutting and rolling. Several maintenance and upkeep items for the fixed boarding bridge: each rotating shaft pin should be maintained regularly to reduce wear and enhance flexibility in use; The use of hydraulic oil should follow the specified model, usually 46 # or 68 #, which should be changed every six months and the oil tank should be cleaned; All rotating parts should be regularly cleaned, and the market should clean the dust, sand, oil, iron blocks, etc. on them. During maintenance, do not use water to clean them directly; Regularly inspect all parts for signs of detachment, welding, or looseness, and promptly handle them to avoid breakage during loading; If there is a large area of paint peeling off the ground, it should also not be re applied to avoid rust and corrosion. Hydraulic boarding bridges have become an essential loading and unloading equipment in logistics warehousing. What precautions should be taken when using the equipment? Next, sand holes, shrinkage, and other conditions. Generally, there is a problem with the casting, which is the quality of the oil cylinder itself. At this time, it is necessary to find a manufacturer to replace the new boarding bridge. Normally, this situation does not occur in the casting oil cylinder. The above two reasons are due to the occurrence of excessive oil leakage, and frequent inspections should be conducted in these two areas. Hydraulic loading and unloading bridge is a specialized auxiliary equipment that maintains rapid loading and unloading of goods during the application process. The height adjustment function of the equipment makes the bridge in the middle of the truck guide sufficient to be built. Lifting platforms, trucks, and hydraulic loading and unloading bridges are commonly used cargo loading and unloading equipment.

The lifespan can reach twice that of the tires on the rigid suspension boarding bridge. In addition,ShijingshanSmall boarding bridge, the wear and tear of the rear axle tires varies greatly. Under the same operating conditions, tires that do not use self steering cars wear three to four times faster. It is obvious that the additional cost incurred by using the self steering boarding bridge will soon be compensated. Semi trailers using self steering boarding bridges are flexible in operation and require a narrow road width when turning, suitable for various occasions. Experiments have shown that the turning radius of a semi trailer with the same body length and load can be reduced by about 10% when using a self steering car.

reform.Set up a new oil warehouse testing system: Before entering the hydraulic lifting channel, hydraulic oil should be stopped from sampling and testing. Unqualified oil should be stopped from entering the warehouse, and the quality of the warehouse should be strictly controlled. A special hydraulic oil protection system should be set up: the oil should be stored and stored according to the brand when entering the warehouse, and disorderly storage should be prohibited. It should be stored in a dry and ventilated place in the open air for daily rain and rain, and should not be close to the fire fixed hydraulic boarding bridge. Label storage system should be established for mixed types, It is necessary to fill out labels in a timely manner and conduct regular sampling and testing: In order to ensure the quality of the oil products leaving the warehouse, it is necessary to conduct seven regular inspections of the hydraulic oil inventory. Any unqualified oil products found after testing should be disposed of in a timely manner and containers should not be used for regular cleaning. Containers containing hydraulic oil should be cleaned regularly, and special personnel should be assigned to handle some of the more precise parts in the fixed hydraulic boarding bridge. Although mechanical hydraulic drive is labor-saving and convenient, it is also complex and damaged. The primary reason for the fixed hydraulic boarding bridge is that its operating principle and structural characteristics are not clear, and its preventive maintenance is not very clear. The fixed boarding bridge is for convenient repair and maintenance. It will not affect the normal operation of the equipment.

There is a support rod that ensures the safety of maintenance personnel entering the interior of the boarding bridge for maintenance.

  2. The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform and there is basically no change to the building structure. During construction, the factors of loading and unloading operations were not taken into account. The platform type loading and unloading bridge serves as a remedial solution and can also meet the requirements for loading and unloading operations into truck carriages. The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms.


ShijingshanTaibian boarding bridgeHow to perform preventive maintenance



The fixed hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, and only one person can work to achieve fast loading and unloading of goods. Boarding bridges reduces a large amount of labor for enterprises, improves work efficiency, and achieves greater economic benefits.

technical service.Firstly, before using the equipment (shè bè i) it is necessary to check whether there is water accumulation in the points, and then confirm whether the fasteners are damaged or loose. If a fault is detected, necessary repairs and replacements need to be carried out. Check all control devices (zhu ā ng zhì) Whether the operation is normal, whether the switch and governor are in good condition, whether the movement and working speed are stable, and whether the display is normal

The overall module of the water inlet pipe of the hydraulic boarding bridge must have a reasonable hydraulic system during the application process, so that the equipment has excellent airtightness and a long service life and the height of the equipment is fixed

Install anti rolling foot skirts on both sides to prevent accidental injury to the toe platform.

Shijingshan.Regarding the year-end maintenance of the boarding bridge, check all hydraulic pipelines and joints to ensure that they are not damaged or loose. All joints must be tightened; Discard all hydraulic oil and replace it with new oil to avoid continuing to use old oil. Otherwise, the moving components in the system will accelerate wear and tear. Remove and disassemble the lowering valve, blow out the plunger with compressed air, and then reinstall it. To use a fixed hydraulic boarding bridge, it is necessary to have a basic understanding of its basic knowledge. Below, Jinan Zhongding Elevator will analyze it for everyone: To operate a fixed hydraulic boarding bridge, first open the rear door of the truck, fix it on both sides of the carriage, and then reverse the truck to the front of the platform until it meets the anti-collision rubber blocks on both sides of the fixed hydraulic boarding bridge. Then, brake the truck. Turn on the power switch on the electric control box and the professional boarding bridge factory has stable, safe, reliable, and can achieve maintenance free performance. The technical level has reached the domestic level and the international advanced level of similar products

The equipped brake pads can effectively prevent the shifting of the boarding bridge during truck loading and unloading.

Function: Convenient unloading, strong stability, and low maintenance cost. Suitable for various vehicles on loading and unloading sites and places with relatively busy traffic. Loading and unloading platforms, lifting platforms, and unloading platforms: anti slip device: This device is welded from steel plates, which can effectively achieve anti slip function and is safe and reliable.