GaobeidianMounted axle hydraulic fixed typeHow is the production status

announcer:hp258HP138990173 release time:2024-05-05 17:02:42

Set up a new oil warehouse testing system: Before entering the hydraulic lifting channel, hydraulic oil should be stopped from sampling and testing. Unqualified oil should be stopped from entering the warehouse, and the quality of the warehouse should be strictly controlled. A special hydraulic oil protection system should be set up: the oil should be stored and stored according to the brand when entering the warehouse, and disorderly storage should be prohibited. It should be stored in a dry and ventilated place in the open air for daily rain and rain, and should not be close to the fire fixed hydraulic boarding bridge. Label storage system should be established for mixed types, It is necessary to fill out labels in a timely manner and conduct regular sampling and testing: In order to ensure the quality of the oil products leaving the warehouse, it is necessary to conduct seven regular inspections of the hydraulic oil inventory. Any unqualified oil products found after testing should be disposed of in a timely manner and containers should not be used for regular cleaning. Containers containing hydraulic oil should be cleaned regularly, and special personnel should be assigned to handle some of the more precise parts in the fixed hydraulic boarding bridge. Although mechanical hydraulic drive is labor-saving and convenient, it is also complex and damaged. The primary reason for the fixed hydraulic boarding bridge is that its operating principle and structural characteristics are not clear, and its preventive maintenance is not very clear. The fixed boarding bridge is for convenient repair and maintenance. It will not affect the normal operation of the equipment.

Regarding the year-end maintenance of the boarding bridge, check all hydraulic pipelines and joints to ensure that they are not damaged or loose. All joints must be tightened; Discard all hydraulic oil and replace it with new oil to avoid continuing to use old oil. Otherwise, the moving components in the system will accelerate wear and tear. Remove and disassemble the lowering valve, blow out the plunger with compressed air, and then reinstall it. To use a fixed hydraulic boarding bridge, it is necessary to have a basic understanding of its basic knowledge. Below, Jinan Zhongding Elevator will analyze it for everyone: To operate a fixed hydraulic boarding bridge, first open the rear door of the truck, fix it on both sides of the carriage, and then reverse the truck to the front of the platform until it meets the anti-collision rubber blocks on both sides of the fixed hydraulic boarding bridge. Then, brake the truck. Turn on the power switch on the electric control box, and the professional boarding bridge factory has stable safe, reliable, and can achieve maintenance free performance. The technical level has reached the domestic level and the international advanced level of similar products

Gaobeidian.  3. Mobile loading and unloading bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods is required. If there is no loading and unloading platform at the logistics site, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. What should I do if the hydraulic cylinder of the boarding bridge leaks oil? The hydraulic cylinder is a relatively important component in hydraulic equipment, responsible for the lifting and lowering work of the equipment. When there is oil leakage in the hydraulic cylinder, and forklifts and other vehicles to move and load goods in batches inside the truck. With only one person working, improve work efficiency, and obtain greater economic benefits.

.Used as a bridging device between forklifts and trucks, facilitating loading and unloading of goods. Large dynamic load: 6T, large static load: 6T, large width: 2M, large length: 4M. There are many classifications, generally divided into mobile boarding bridges and fixed boarding bridges. General: Solid tires with a length of 11M and a width of 1M. The Ramp loading and unloading platform is a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain,GaobeidianHydraulic fixed boarding bridge, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

Fixed loading and unloading bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles to move and load goods in batches inside the truck. With only one person working, fast loading and unloading of goods can be achieved. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.

Fixed loading and unloading bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles to move and load goods in batches inside the truck. With only one person working, fast loading and unloading of goods can be achieved. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.


GaobeidianMounted axle hydraulic fixed typeHow is the production status



Activate the up button. When the board reaches a high height, the overlap plate will automatically straighten and be parallel to the panel. At this time, release the up button and the panel will automatically descend until it connects with the carriage. Once confirmed, the operation can begin. After waiting for the homework to be completed, press the up button to drive the vehicle away. Release the button panel and it will automatically descend to its original state, parallel to the cargo platform.

When using the boarding bridge for loading and unloading, and do not be overweight. If overweight occurs, it will make the hydraulic system struggle during the lifting process, and even cause deformation of the hydraulic cylinder body, resulting in gaps and oil leakage outward. This requires finding a professional manufacturer for maintenance, such as Shanghai Niuli Machinery. If the deformation is severe the only option is to replace it with a new one.

Function: Convenient unloading, strong stability, and low maintenance cost. Suitable for various vehicles on loading and unloading sites and places with relatively busy traffic. Loading and unloading platforms, lifting platforms, and unloading platforms: anti slip device: This device is welded from steel plates, which can effectively achieve anti slip function and is safe and reliable.

Inspection items.Product features: Fully hydraulic drive, easy to operate and reliable to operate.

There are generally several forms of axle 1. Embedded boarding bridge, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings.

Before delivery for use, it is necessary for us to conduct static and dynamic experiments on the fixed hydraulic boarding bridge equipment to achieve different application effects. Based on the equipment environment of the elevator and the application requirements of the fixed hydraulic boarding bridge itself, selecting appropriate equipment can achieve very good application effects. It is a specialized auxiliary equipment for completing the rapid loading and unloading of goods. The fixed hydraulic boarding bridge is used indoors or outdoors, and whether it is a fixed lifting channel or a mobile lifting channel. The fixed hydraulic boarding bridge helps to ensure the safe operation of our equipment. The countertop adopts a specially designed diamond grid plate with reliable strength, which can ensure long-term use without deformation. Its diamond shaped mesh structure fully ensures excellent anti slip performance, making the forklift have better climbing and maneuverability. Even in rainy and snowy weather, normal use can still be guaranteed.


GaobeidianMounted axle hydraulic fixed typeHow is the production status



The equipped brake pads can effectively prevent the shifting of the boarding bridge during truck loading and unloading.

Honest management.The rear folding transition plate and forklift traction hook can easily move the boarding bridge. A layer of toothed anti-skid plates or checkered plates is laid on top of the bridge body. The mesh is twisted and hollow,GaobeidianHydraulic boarding bridge mobile type, which not only improves the reliability of work, but also prevents the accumulation of grease, dirt, rainwater, and ice and snow. This equipment is particularly suitable for explosion-proof and flammable places, with manual hydraulic power, without generating sparks and no worries. The power can be configured as: manual hand pump power. Electric power. Ensure that the oil cylinder is processed by iron cutting and rolling. Several maintenance and upkeep items for the fixed boarding bridge: each rotating shaft pin should be maintained regularly to reduce wear and enhance flexibility in use; The use of hydraulic oil should follow the specified model, usually 46 # or 68 #, which should be changed every six months and the oil tank should be cleaned; All rotating parts should be regularly cleaned, and the market should clean the dust, sand, oil iron blocks, etc. on them. During maintenance, do not use water to clean them directly; Regularly inspect all parts for signs of detachment, welding, or looseness, and promptly handle them to avoid breakage during loading; If there is a large area of paint peeling off the ground, it should also not be re applied to avoid rust and corrosion. Hydraulic boarding bridges have become an essential loading and unloading equipment in logistics warehousing. What precautions should be taken when using the equipment? Next, the boarding bridge manufacturer - editor will provide a detailed introduction (xiá ng xì)

With the listing of Alibaba Group on the New York Stock Exchange in the United States, it will also have a significant impact on the development of the entire internet and logistics industry. The valuation is as high as 175 billion US dollars! The professional boarding bridge factory and other various types of products have a complete range, selling well both domestically and internationally. The equipment has a long service life! The industry leader in product wire products, welcome to inquire

Afterwards, before the operation of the equipment (shè bè i), inspect the condition of the rotating grease (grease) check the condition of the rotating support gear (Gear), and immediately handle any abnormalities (ch ǔ l ǐ). Professional boarding bridge factory quality assurance, professional company, high cost-effectiveness, has become the preferred brand for many wire products, welcome to purchase!

Gaobeidian. 

A one line boarding bridge suitable for special heavy-duty vehicles in special situations. If all the wheels of any multi axle vehicle are rigidly suspended on the frame of the trailer,GaobeidianForklift boarding bridge, it cannot be guaranteed that all the wheels will be suspended from the ground at the same time when driving on harsh roads, resulting in accidents such as wheel suspension and serious vehicle body accidents. It seriously affects the driving smoothness and handling stability of the vehicle. The use of a one line, two axle boarding bridge can ensure that all wheels have good contact with the road surface when driving on harsh road conditions thereby reducing accidents such as vehicle body and improving vehicle driving smoothness and handling stability. The self steering boarding bridge is designed based on the principle of adjusting and stabilizing steering according to different loads. The hydraulic boarding axle beam and the steering pin fluctuation pressure bearing are connected together. When the vehicle is traveling in a straight line, thereby maintaining the straight running state of the wheels. Whenever a semi trailer turns the mass of the vehicle itself causes the upper and lower wavy pressure plates to mesh closely with each other, the wavy tooth surface of the pressure bearing is misaligned, raising the axle beam and causing the wheels to automatically turn. The frictional resistance between the two pressure blocks also needs to undergo corresponding changes depending on the load on the boarding bridge. In addition, according to different loads, the steering angle limiter can automatically increase the steering angle. At the same time, the steering tie rod also causes the instantaneous center of rotation of two wheels to coincide. The anti slip device of the boarding bridge is welded with steel plates, safe and reliable. Anti collision blocks can effectively protect buildings and boarding bridges from damage. It is made of highly resistant reinforced rubber. The four outer corners of the anti-collision block are all arc-shaped and all bolt holes are deeply embedded inside. Bolt hole size is Ф The anchor bolt mounting bridge for M20 assembly is composed of a mechanical system, a hydraulic system, and an electrical system. The platform and chassis form a mechanical system. Elevating the platform to; U” Shaped steel as the skeleton, with light self weight and large bearing capacity; The countertop is made of anti slip patterned steel plates and has a high load-bearing capacity; The countertop is made of anti slip patterned steel plates, and can withstand a speed of 10 kilometers/hour when the forklift is fully loaded without bending, improving work reliability.

Assuming that the manufacturing quality of fixed hydraulic boarding bridges is not satisfactory, the reasons for their shortcomings are mostly preventive repairs, and there are usually fewer elements of abnormal operation.