Sauergo taoeryangAluminum alloy elevator single columnFactors that delay corrosion

announcer:hp323HP155335083 release time:2024-01-28 12:14:07

Dirty normally closed valve; The solution is to remove the normally closed valve and use cleaning agent or cleaning.

The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

Sauergo taoeryang.Before use, carefully check the grounding wire, safety devices, buffer springs, etc. Ensure a safe usage environment.

A type of elevator equipment consisting of a walking mechanism, hydraulic mechanism electric mechanism, and support mechanism. The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter explosion-proof electromagnetic directional valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge.

.Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

Hydraulic lifting platforms are widely used in factory maintenance, municipal construction,Sauergo taoeryang2-story small household elevator, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor,Sauergo taoeryangCar mounted scissor lift, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).


Sauergo taoeryangAluminum alloy elevator single columnFactors that delay corrosion



Outriggers: mechanical outriggers, hydraulic outriggers, and pull-out outriggers. Professional elevator manufacturer with large quantity and excellent quality at a reasonable price. Fire resistant, waterproof, high temperature resistant, sturdy and durable, safe and reliable

How to use a hydraulic elevator and whether the emergency stop device is effective is very important during use. If special circumstances arise, the emergency stop can be used. Therefore before use, it is necessary to carefully check whether all items are normal and ensure the effectiveness of the braking device.

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

market.The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

The method is that it may cause increased wear and inflexibility of the parts, and it is also important to pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation, use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to strictly follow the installation and use related matters below, and carefully assemble and use it.

2: Chemical rust removal mainly involves the use of acid to react with the metal components of the screw elevator to remove rust products from the rust surface of the push rod. This type of rust removal is mainly used for large mechanical screw elevators, and attention should be paid to protecting precision devices such as electronic instruments from acid corrosion during use.


Sauergo taoeryangAluminum alloy elevator single columnFactors that delay corrosion



Three column aluminum alloy elevator: Three sets of masts support the synchronous lifting of the working platform,Sauergo taoeryangConstruction site material elevator, and the support structure is the same as that of a single masted platform, with super large load capacity and work stability. The overall lifting guardrail device has good strength and greatly reduces the height of the entire machine during transportation. It is very convenient for loading and unloading, and can be assembled or disassembled in one lift.

Product survey.Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.

Carefully prepare a special construction plan for installation and construction, and provide safety technical disclosure to installation personnel. We provide various elevator manufacturers to individuals and enterprises nationwide for a long time, with on-site settlement and honest operation. We have offices in various regions and can cooperate for a long time

The normally closed valve and motor are energized simultaneously; The solution is correct wiring, elevators are widely used and are involved in many industries. The spiral elevator is no exception and has a very good effect. But sometimes the surface of the spiral elevator will rust, which has a certain impact on work efficiency and needs to be removed. So what is the solution to the surface rust of the spiral elevator?

Four column aluminum alloy elevator: the whole elevator is made of high-strength aluminum profiles. Due to the high strength of the profiles, the four mast structure is adopted, flexible operation, large load capacity, large platform area and convenient implementation. Its appearance allows for high lifting capacity in extremely small spaces. Minimize the deflection of the lifting platform.

This series of products has a load capacity of 0.1 to 0.8 tons, and can also be customized according to user requirements with a load capacity of up to 10 tons.