KaroyDistribution transformer coreWhat are the requirements for the job

announcer:hp122HP117294921 release time:2024-05-06 15:48:55

For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

Karoy.The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation, offset, cracking, loosening, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, etching and turbidity, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.

Before no-load impulse closing, the transformer shall be placed for 24h, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

Noise pollution control and prevention measures of dry-type transformer

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding that is,KaroyMarket analysis of dry type transformer,KaroyMain components of box transformer, the disconnection component of the electric field is small.


KaroyDistribution transformer coreWhat are the requirements for the job



When the full load test is carried out and everything is normal, the load can be connected.

Transformer inspection ear

The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.

Where can I find it?.When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

Manufacturing process and steps of dry-type transformer

Therefore in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, and the harm will not expand to a greater extent.


KaroyDistribution transformer coreWhat are the requirements for the job



The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

Energy costs.The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

Principle of step-up dry-type transformer: the step-up dry-type transformer is a component that correspondingly converts low communication AC voltage, large current flow and small characteristic impedance into high communication AC voltage, small current and large characteristic impedance. When there is an AC circuit in the original coil, the communication AC magnetic flux will be caused in the transformer core (or magnetic core), causing the magnetic induction voltage in the primary coil (or current).

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal,Karoy16 kV Transformer, and the transformer will turn to all normal operation.

Karoy.The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.