KibogaPower transformer fence regulationsWeak stability and poor price

announcer:hp122HP117294921 release time:2024-05-05 16:11:20

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

Solenoid insulation deterioration

Kiboga.Transformer inspection ear

What is the reason for the shutdown of power transformer?

.In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

Before application,KibogaCooling mode of oil immersed transformer, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle,KibogaPower transformer function, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).


KibogaPower transformer fence regulationsWeak stability and poor price



Dry type transformer manufacturer

The domestic transformer market is slow

Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

Energy costs.The noise of dry-type transformer comes from

After no-load test run is normal for 24h it can be transferred to on-load operation, the closing shall be maintained by high-voltage arrester 50% and 75% by grade.

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).


KibogaPower transformer fence regulationsWeak stability and poor price



Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

Honesty and mutual benefit.Performance and main parameters of common metal composites, various welding processes and machinery and equipment preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process,KibogaTechnical performance table of dry type transformer, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, which shall not exceed 2% compared with the last accurate measurement result.

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

Kiboga.The key reason for oil leakage is that there are defects in cast iron parts

After the test, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, so as to test the safety performance of the transformer operation.