TabsukWaste power transformerCommon problems and solutions

announcer:hp122HP117294921 release time:2024-05-05 11:35:04

Noise dispersion of dry-type transformer

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as 2012, providing subsidies of 4-30 yuan / KVA for energy-saving transformers.

Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

.When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.

The method and whole process of taking oil sample of power transformer are as follows:


TabsukWaste power transformerCommon problems and solutions



After tightening the loose bolts, seal the flange, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.

If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular,TabsukBox type oil immersed transformer, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.

Honest management.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

What is the reason for the shutdown of power transformer?

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.


TabsukWaste power transformerCommon problems and solutions



The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

Customer first.Fault judgment of power transformer

Visual inspection method for transformer inspection

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

Tabsuk.The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation,TabsukOverload capacity of oil immersed transformer,TabsukPower transformer oil immersed, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.

Noise dispersion of dry-type transformer

After no-load test run is normal for 24h, it can be transferred to on-load operation and the load shall be gradually increased from 25%, 50% and 75% by grade.