WAWADry type transformer 400KVAPerformance comparison

announcer:hp122HP117294921 release time:2024-05-02 17:50:00

Power transformer factory

When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe, clean the periphery of the sampling port with clean or hairless linen.

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation,WAWAS13-50 power transformer, the good model is the solid model of infinite transformer core column, but there are many calculation methods.


WAWADry type transformer 400KVAPerformance comparison



Oil immersed transformer operation

The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However, because of certain necessity, the dry-type transformer will also boost voltage, and the whole process of boosting voltage is very complex,WAWAProduction process of oil immersed transformer,WAWABasket electric box transformer, and there are many principles.

What is the reason for the shutdown of power transformer?

Sampling inspection.If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

Wiring mode of dry-type transformer:


WAWADry type transformer 400KVAPerformance comparison



Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

Honesty is the foundation.Method and process of taking oil sample of power transformer

Transformer inspection ear

Dry type transformer manufacturer

WAWA.When we apply oil immersed transformer we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

What is the wavelength of oil immersed transformer?

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.