KasonguPower transformer price: 1000KVAhow to use

announcer:hp122HP117294921 release time:2024-04-26 13:11:42

Power transformer factory

Falling foreign matters and piercing

Kasongu.The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, which shall not exceed 2% compared with the last accurate measurement result.

(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

.Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.

For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.


KasonguPower transformer price: 1000KVAhow to use



The noise of dry-type transformer comes from

The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large,KasonguTransformer inductor, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

install.Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Connection group structure of dry-type transformer


KasonguPower transformer price: 1000KVAhow to use



Power transformers are also used for testing, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.

OK or not?.For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

It can be seen from the above that from the perspective of power saving in some cases,KasonguOil immersed transformer S13, transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, Even less than & ldquo; Great Lars, little dragons & rdquo;,Kasongu110kV transformer, Therefore, the loss of transformer full load and load must be considered in the calculation, and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: 3. The transformer load rate and power saving will be brought into the formula: the load index of the transformer, that is, the operating load and rated capacity of the transformer 1. Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P, and then reduce the active power loss of the large capacity transformer from the active power loss of the small capacity transformer: that is, the formula is reduced The load index is the load index when the transformer operation loss is small and the rate is large and the rate is large when the specific copper loss is equivalent to iron loss.

Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

Kasongu.The voltage regulating tap changer is not in place or poor

The dry-type transformer is composed of two winding resistances, resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D, Y & rdquo;, & ldquo; y, D & rdquo; and & ldquo; D, D & rdquo;. In China, only & ldquo; y, Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, it will not be upgraded. All marks show that with neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn0 wiring group when UAB and UAB overlap, the minute hand points to 12. & ldquo; 12 & rdquo; in the new wiring group, it is indicated by & ldquo; 0 & rdquo.