BrindisiGuide rail type cargo elevator cargo elevatorsincere service

announcer:hp779HP136589660 release time:2024-04-03 13:14:09

Motor connection error. When the triangular connection motor is mistakenly connected into a star shape,BrindisiA cargo elevator needs to, the motor still operates with full load, and the current flowing through the stator winding exceeds the rated current, leading to the motor stopping itself. If the stopping time is slightly longer and the power supply is not cut off, the winding will not only be severely overheated, but also burned. When a star connected motor is mistakenly connected into a triangle, or when several coil groups are connected in series into a single branch, the motor is mistakenly connected into two branches in parallel, both the windings and the iron core will overheat,Brindisi13 meter guide rail type cargo elevator, and in severe cases, the windings will be burned.

Incorrect connection of the elevator motor When a coil, coil group, or one phase winding group is connected inversely, it can cause a serious imbalance in the three-phase current and cause the winding to overheat.

Brindisi.The guide mechanism of the guide mechanism of the guide rail elevator manufacturer is mainly composed of guide plastic pipes, compression springs, guide housings, and guide shafts. As a semi sectional view of the guide mechanism a narrow gap is formed between the two guide plastic pipes, a small guide rod is designed on the safety plug and the lifting cloth belt extends out of the box from this narrow gap to prevent the cloth belt from being tangled and serve as a guide. The safety plug is supported by a guide bracket and a compression spring. In order to prevent the compression spring from losing stability after being stressed, and the gap between the small guide rod and the spring is designed according to the table. The crane arm shaft is welded and installed with a crane arm hook at both ends. The material is selected and subjected to conditioning treatment. It forms three suspension points with the hook at the lower shell of the box. The soft support sling will be lifted by the person being lifted. The load bearing capacity of the crane arm is designed to ensure that the person being lifted can be in a comfortable state when riding. The distance between the two crane arm hooks is listed in the table as a design reference, and the balance bar is used to maintain the balance of the lifting device, reducing the overall weight of the boom.

Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

.It should be noted that compared to some lifting platforms in certain venues, protective barriers are generally added to the platform. As lifting platforms belong to special equipment, the National Quality Inspection Bureau strictly inspects this area. Any lifting platforms that are deemed to have safety hazards must be removed. Therefore, when personnel ask if you need to add guardrails, do not blindly refuse, and consider whether it is necessary based on the site of use. 'In addition, it is necessary to possess two types of certificates, namely, the Special Equipment Manufacturing License of the People's Republic of China and the Special Equipment Installation, Transformation, and Maintenance License of the People's Republic of China, before production, installation, and maintenance can be conducted. Therefore, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked


BrindisiGuide rail type cargo elevator cargo elevatorsincere service



It is strictly prohibited for personnel to climb up and down the floors by using the goods elevator privately.

After careful inspection,BrindisiFixed lifting hydraulic cargo elevator, it was found that there were two main causes: loss of hydraulic pressure and leakage of hydraulic valves or seals.

Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient space for parking equipment. When using a steam crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the steam crane.

Where can I find it?.Many people believe that the mechanical strength of the elevator itself is relatively high when using the elevator, so the installation method specified in the manual is not strictly followed during the installation process. However, this can lead to increased wear of parts and inflexibility in operation. In addition, it is necessary to pay attention to the installation precautions corresponding to the working environment and not be careless. Correct installation, use, and maintenance of the elevator are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to carefully assemble and use it in strict accordance with the following installation and use related matters.

Before installing the elevator, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.

After the goods are transported, clean the platform.


BrindisiGuide rail type cargo elevator cargo elevatorsincere service



Scissor type fixed lifting platform is a transportation and loading equipment that transports goods from one height to another. After operation, the platform is level with the ground, without occupying ground space and affecting passage passage.

Manufacturing cost.Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranking outriggers, and pull-out outriggers.

Manual hydraulic platform classification: Manual hydraulic lifting platform vehicles can be divided into manual hydraulic handling platform vehicles, manual hydraulic stacking platform vehicles, and manual hydraulic shear type platform vehicles.

Is the water cooling and air cooling of the hydraulic station the same?

Brindisi.Incorrect connection of the elevator motor When a coil coil group, or one phase winding group is connected inversely, it can cause a serious imbalance in the three-phase current and cause the winding to overheat.

Does the cleanliness of the hydraulic station have relevant rules and requirements?

Walking: assisted self-propelled, two wheel traction, self driving, and car modification.