Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

Pisa.Popularize in the market.

2: Chemical rust removal mainly involves the use of acid to react with the metal components of the screw elevator to remove rust products from the rust surface of the push rod. This type of rust removal is mainly used for large mechanical screw elevators, and attention should be paid to protecting precision devices such as electronic instruments from acid corrosion during use.

.Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranked outriggers, and pull-out outriggers. Professional elevator manufacturer with large quantity and excellent quality at a reasonable price. Fire resistant, waterproof, high temperature resistant, sturdy and durable, safe and reliable

Fixed boarding bridge: A fixed boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles to move and batch goods inside the truck

The operation of the single column aluminum alloy elevator is relatively convenient. The gantry is easy to assemble across the frame, with labor-saving operation and flexible movement. It can cross obstacles such as fixed seats with a height of up to 1m, and can operate stably on steps. Made of high-strength rectangular steel pipes, which is suitable for crossing different obstacles. The two end brackets are vertically adjustable and can be used for operations on slopes or steps with a certain slope.


PisaConstruction site construction elevatorsSpecial application environment



The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.

It is good not to cover the car with clothes for high-altitude work vehicles. If the vehicle is parked outside in windy and rainy weather, the clothes will repeatedly slap the car paint, especially if the car is blowing sand on the clothes, it will draw many small scratches on the clothes, because over time, it will lead to black paint. In addition, when the wind does not directly spray powder or clean the mechanism on the sand it should be washed with water and prevent the high-altitude work vehicle vacuum cleaner from scratching the sand particles on the paint surface.

Many people believe that the mechanical strength of the elevator itself is relatively high when using it, so during the installation process, there is no

Word of mouth recommendation.Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole,PisaConstruction site construction elevator, remove the motor shaft key.

Purpose The hydraulic lift is widely used in various industrial enterprises and production lines such as automobile, container,PisaCar mounted scissor lift, mold manufacturing, wood processing, chemical filling, etc., to meet the lifting requirements of different operation heights, and can be equipped with various table forms (such as ball, roller, turntable, steering, tipping, telescoping), linkage, explosion-proof), it has the characteristics of stable and accurate lifting, frequent starting, and large load capacity, Effectively solve various lifting and lowering difficulties in industrial enterprises, making production operations easy.

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.


PisaConstruction site construction elevatorsSpecial application environment



Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.

ranking.When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

Now we have an increasing demand for cargo elevators. Let me introduce the maintenance work of guide rail cargo elevators to you. When we use a guide rail elevator in our daily life, we need to regularly inspect maintain, and maintain it. This not only extends the service life of the guide rail elevator, but also makes it more powerful when working!

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

Pisa.The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

Walking: assisted self-propelled, two wheel traction, self driving, and are specialized hydraulic cargo elevator products. They are mainly used for transporting goods up and down between various working floors; Vertical garage and car lift between garage floors. The hydraulic system of the product is equipped with anti fall and overload protection devices, and operation buttons can be set on each floor and lifting platform workbench to achieve multi-point operation.