Hui CenHuangshi boarding bridgePromote the growth of joint ventures

announcer:hp161HP196399230 release time:2024-01-10 10:20:47

Open planning before placement makes it easy to clean up clutter.

For slopes that are unstable or unstable after earthwork excavation top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Hui Cen.When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

.When the hydraulic oil is insufficient, the hydraulic pump will produce suction phenomenon, causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.


Hui CenHuangshi boarding bridgePromote the growth of joint ventures



To ensure that the hydraulic boarding bridge is in good condition it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

(3) The steel wire rope in the elevator should be regularly checked for loose strands and broken wires, as it is frequently used and is also an important component. Therefore, but also doubles the efficiency of loading and unloading operations, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.

Industry management.To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

When it comes to fixed hydraulic boarding bridges, I believe


Hui CenHuangshi boarding bridgePromote the growth of joint ventures



The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

Fair price.What should I pay attention to when choosing a boarding bridge? The selection and purchase of the boarding bridge involves paying attention to three issues, including its range of use, rated load, and other factors; Their understanding of the manufacturer of the boarding bridge, whether their enterprise qualifications, special equipment licenses are complete, how many after-sales service outlets are there in the country, how about their after-sales service attitude and whether they are timely; The important point is whether the quality is good or not, and whether the price is reasonable. If both of these situations are reasonable,Hui CenTruck boarding bridge, you can choose the products of the manufacturer.

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

Open the manual valve, and secure more than 90% of the lip plates at the bottom of the container.

Hui Cen.The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons,Hui CenLifting and lowering of boarding bridge, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods,Hui CenFixed hydraulic boarding bridge, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

conduct.