MILUSElectric elevators for construction sitesPrices will rise after the holiday

announcer:hp935HP175192871 release time:2024-05-19 13:41:26

MILUSElectric guide rail elevator,

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

MILUS.Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

.Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Horizontal lead screw mechanical electricity


MILUSElectric elevators for construction sitesPrices will rise after the holiday



The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

When adding hydraulic oil, it is also necessary to pay attention to the structure of the oil cylinder. Some oil cylinders are relatively complex internally, and how many lifting operations need to be carried out during filling to fully fill each position of the hydraulic oil. Therefore when filling,MILUSElectric folding elevator, try to add as much as possible, and then test and run the machine empty to see if it reaches the rated position.

Acceptance: Concrete strength grade C30,MILUSElectric screw elevator, strength testing report.

Price.Mechanical devices controlled by cage movement should not be used to open or close the landing door.

In order to meet the needs of contemporary audiences and achieve perfect effects, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting bridges, lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery meeting the needs of stage craft layout, meeting the needs of stage design and choreographers creating special atmosphere and effects, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer


MILUSElectric elevators for construction sitesPrices will rise after the holiday



The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

market.The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Try to use this equipment in areas with wind force less than level five, and avoid using it when the wind force is too strong to avoid accidents.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

MILUS.Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.