DetroitElectronic high voltage transformerProblems that need to be paid attention to in construction

announcer:hp122HP117294921 release time:2024-05-07 13:40:31

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

Difference between dry-type transformer and oil immersed transformer:

Detroit.Dry type transformer is a common electrical equipment, which can be used to convert the alternating voltage of one standard value into another standard value of the same frequency. The step-up dry-type transformer is used to convert the low-grade alternating voltage into another high-grade alternating voltage of the same frequency. It is widely used in high-frequency industries, such as variable frequency power supply.

In the case of dry-type transformer operation, there is more noise, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.

.In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

Operation and maintenance management of oil immersed transformer

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.


DetroitElectronic high voltage transformerProblems that need to be paid attention to in construction



The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, which will cause induced electromotive force on the plan with the magnetic induction line. Because this electric flow creates a closed loop to generate an electric field and forms a vortex, it is called vortex. The existence of vortex makes the transformer core hot and consumes kinetic energy. This kind of loss is called vortex loss.

The noise of dry-type transformer belongs to low-frequency noise. In a small area, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.

Product survey.When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular,DetroitModel of 35kV dry type transformer, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.

Loose core screw


DetroitElectronic high voltage transformerProblems that need to be paid attention to in construction



When the transformer is out of phase,DetroitModel of electronic transformer, if the second phase is blocked there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

Installation works.Power transformer plant

It can be seen from the above that from the perspective of power saving, in some cases, transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, Even less than & ldquo; Great Lars little dragons & rdquo;, Therefore, the loss of transformer full load and load must be considered in the calculation, and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: 3. The transformer load rate and power saving will be brought into the formula: the load index of the transformer, that is, the operating load and rated capacity of the transformer 1. Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P, and then reduce the active power loss of the large capacity transformer from the active power loss of the small capacity transformer: that is, the formula is reduced The load index is the load index when the transformer operation loss is small and the rate is large, and the rate is large when the specific copper loss is equivalent to iron loss.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

Detroit.(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation, a spacing of more than 2m shall be reserved; If metal fence is selected, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

Dry type transformer