HermondElectric small elevatorIndustry category comparison

announcer:hp935HP175192871 release time:2024-05-05 16:41:04

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

Hermond.The cargo is 0.5m.

The L distance depends on the selected wall mount model.

.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

The quality of the standard section should comply with the product manual and specification requirements.


HermondElectric small elevatorIndustry category comparison



According to the needs of different performance genres,HermondElectric barrier free elevator, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage,HermondFully automatic electric elevator, a T-shaped stage, or a hall.

Check the starter potential when the lifting table is not raised or the voltage is too low when the motor load is working. Voltage hydraulic range allowed&

To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Quality improvement.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected and standard sections and other components with severe wear and deformation should be replaced.


HermondElectric small elevatorIndustry category comparison



Electric elevators used in various places.

Free consultation.Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

The occurrence of.

After the electric elevator passes the inspection, installation unit the user unit shall organize the leasing unit, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Hermond.The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

Then, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.