When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

Uedril.The top and middle of the transformer oil tank, the flange plate,Uedril125 KVA dry type transformer, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.

Oil leakage of porcelain pot and laminated glass oil level gauge

.With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage,UedrilDry type transformer, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,

The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation,UedrilVoltage transformer, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.


UedrilSCB dry type transformer modelApplication in the market



Oil leakage of heat pipe radiator

If the input of dry-type transformer is an alternating switching power supply, its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC, add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way, the alternating DC current can be obtained at the output end.

The method and whole process of taking oil sample of power transformer are as follows:

Professional is king.Noise dispersion of dry-type transformer

In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

What about oil immersed transformer fire?


UedrilSCB dry type transformer modelApplication in the market



The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, two-color short circuit or short circuit on the ground resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

Test conclusion.The key reason for oil leakage is that there are defects in cast iron parts

First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage), it indicates that the transformer is seriously damp and the trial operation shall be terminated.

Some are tied with plastic tape, and some immediately press the two edges together because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.

Uedril.Noise dispersion of dry-type transformer

The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.