WroclawAluminum alloy hydraulic cargo elevatorThree basic points of homework

announcer:hp750HP120486450 release time:2023-08-16 23:28:38

Regularly check the connection of each part and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure (the rotating arm can be used to cause compression),WroclawAluminum alloy elevator, and all connecting shafts must have split pins and be sufficient. Professional items

Machine manufacturers and other related businesses. Merchants with this business are welcome

Wroclaw.Two sets of masts support the synchronous lifting of the working platform, and the aluminum alloy elevator has stable working performance; The overall lifting guardrail device has good strength and greatly reduces the height of the entire machine during transportation. It is very convenient for loading and unloading, and can be assembled or disassembled in one lift; Can be equipped with gantry cross frames; Having the same convenient maneuverability as a single mast, the support structure is the same as a single mast platform; It has good load-bearing capacity and is suitable for no more than two people climbing at the same time. Professional aluminum alloy elevator manufacturers have advanced technology,WroclawAluminum alloy elevator car mounted, strict testing, and more affordable prices,

Therefore, using a stable voltage for aluminum alloy elevators is crucial for safe operation. Aluminum alloy elevators have high stability, a wide working platform, and a high load-bearing capacity, please ensure voltage stability.

.The standard rack free design of the lifting and lowering machine with high safety performance ensures that the platform will not fall, and the limit and limit switches further ensure the safety of construction personnel.

Machine manufacturers and other related businesses. Merchants with this business are welcome

Good driving performance reduces noise increases the clearance inside the platform, and also makes the transmission smoother and the mechanism vibrates less.


WroclawAluminum alloy hydraulic cargo elevatorThree basic points of homework



When installing, disassembling, and adjusting the rotating mechanism, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable.

The engagement between rotating components and tangent moving components, such as power transmission and its transmission wheels, chains, and sprockets.

Regularly check the connection of each part and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure (the rotating arm can be used to cause compression), and all connecting shafts must have split pins and be sufficient. Professional items

Supply chain quality management.Hydraulic aluminum alloy elevators operate up and down, and can provide us with a safe and stable platform. We can provide security for our safety when working at heights.

Introduction to aluminum alloy elevator: Aluminum alloy elevator is a fixed transportation equipment that lifts items from one height to another. Due to the large weight and volume of the lifted object, it is safe and stable. It can be used as a specialized hydraulic lifting platform product for transporting goods between floors of buildings, with the main function of transporting various work floor goods up and down; At present, aluminum alloy elevators are mostly used in the market for lifting cars in three-dimensional garages and garage floors.

In low concentration carbon monoxide gas. It can cause symptoms such as headache, shortness of breath, nausea and vomiting, body weakness and dizziness, psychological confusion, and even brain damage. In severe cases, it can cause death, such as starting the engine of the equipment in the garage.


WroclawAluminum alloy hydraulic cargo elevatorThree basic points of homework



The scientific design schemes for aluminum alloy elevators mainly include leveling and locking circuits, telescopic balance circuits, variable amplitude balance circuits, emergency lowering systems, etc. In order to prevent sudden damage to the hydraulic system or pipelines of the platform due to accidents, and to ensure that the workbench does not experience situations that endanger the safety of personnel and equipment such as sudden arm fall or workbench overturning, distribution box, lifting machinery needs to undergo regular maintenance after a period of use, and regular maintenance needs to be carried out according to environmental differences.

The hydraulic aluminum alloy elevator is widely used in various industrial enterprises and production lines such as automobile, container, mold manufacturing, wood processing, chemical filling, etc. to meet the lifting requirements of different operation heights. At the same time, it can be equipped with various table forms (such as ball, roller, turntable, tipping, telescoping), and with various ways (transfer, linkage, explosion-proof),WroclawAluminum alloy elevator, it has stable and accurate lifting, frequent starting The characteristics of large load capacity effectively solve various lifting and lowering difficulties in industrial enterprises making production operations smooth. The hydraulic lifting platform mainly uses hydraulic oil pressure transmission to achieve the lifting function. Its shear fork mechanical structure ensures high stability of the aluminum alloy elevator, with a wide working platform and high bearing capacity, making the high-altitude work range larger and suitable for multiple people to work simultaneously. It makes high-altitude operations more efficient and safer.

Wroclaw.Method for hydraulic oil leakage in aluminum alloy elevator: Check if the pipe joints are loose and try to tighten them. Check if the viscosity of the hydraulic oil used is too low. When checking the leakage point of the hydraulic oil system, generally, the place where hydraulic oil seeps out is the leakage point, but it is not ruled out that the leaked hydraulic oil may accumulate along the pipeline deviating from the leakage point. Therefore, it is important to carefully search during inspection. High priced aluminum alloy elevator manufacturers of various specifications welcome scrap merchants, industrial companies, enterprises, and power departments to visit and negotiate with the company!

. Before the maintenance of the hydraulic aluminum alloy elevator starts, the tools used must be counted. After the maintenance is completed, the tools should be classified and organized, and counted to prevent the tools used for maintenance from being left inside the equipment, especially in the distribution box. When repairing the hydraulic system of the aluminum alloy elevator it is necessary to keep the maintenance site clean and dust-free. When repairing and fastening screws for aluminum alloy elevators, it is necessary to use the correct diagonal first. When tightening screws, use a torque wrench to prevent excessive damage to the screws. After the maintenance is completed and before the power on test, it is necessary to count the number of maintenance personnel to ensure that there is no one inside the aluminum alloy elevator. This is very necessary for the maintenance of large fixed hydraulic elevators. After counting the number of people, inspecting and repairing the equipment and the maintenance site, the power transmission test can only be carried out. After the maintenance of the aluminum alloy elevator is completed, the equipment maintenance record must be filled out. The maintenance record should include the equipment maintenance date, the personnel participating in the maintenance, the maintenance items the brand, model and specification of the replaced parts, the effectiveness of the maintenance, and whether the equipment still has problems after the maintenance is completed.

Method: Check the length or diameter of the power supply lead. When the wire length is not more than 25 meters, the wire diameter should not be less than 1m ²; When the wire length is not greater than 50 meters, the wire diameter should not be less than 5m ². You can try fixing the plug directly to the socket without moving the cable.