PforzheimSingle mast aluminum alloy lifting platformManufacturing process analysis

announcer:hp275HP127226562 release time:2023-10-20 09:49:33

The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, it is necessary to perform stress relief treatment on the completed components.

However, large weight, large differences in residual stress size and distribution, and it is difficult to achieve good results using ordinary vibration aging technology. Therefore, they found Nanjing Juhang and our JH-700 vibration aging equipment, and requested us to develop a complete vibration aging process.

Pforzheim.Check if the orientation of the upper and lower limit blocks on the guide rail frame is correct

Emergency stop: Press the emergency button switch to raise or lower the machine.

.The second method is the protective layer method, which covers the metal surface of the aluminum alloy lifting platform with a protective layer to isolate the metal products from the surrounding corrosive medium and prevent corrosion. Apply engine oil, petroleum jelly, paint, or cover the surface of steel parts with corrosion-resistant non-metallic materials such as enamel and plastic; Using electroplating, hot plating, spray plating, etc., to coat the surface of steel with a layer that is not easily corroded

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

During aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable, indicating that the structure of molecules inside the component tends to be stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy12 drivers must carefully check the electrical, hydraulic, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation


PforzheimSingle mast aluminum alloy lifting platformManufacturing process analysis



Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and an elevation of 1-25 meters, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders also known as hydraulic elevators, ensuring smooth operation low noise, convenient maintenance, and long service life. In case of power failure, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance, good waterproof performance, and fire and high temperature resistance, Strong overload capacity, corrosion resistance, radiation resistance, long service life. The top layer height is not affected, and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories, and can be used both internally and externally.

Regarding the construction elevator with counterweight, check the adjustment and fixation status of the counterweight guide wheel. Check the balancing equipment of the steel wire rope, the crown wheel, and the counterweight steel wire rope bracket

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

equipment maintenance .Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and an elevation of 1-25 meters, guide rail elevators, also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, low noise, convenient maintenance, and long service life. In case of power failure, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance,PforzheimMobile cllimbing, good waterproof performance and fire and high temperature resistance, Strong overload capacity, corrosion resistance, radiation resistance,PforzheimPrice of Mobile Scissor Fork Lifting Platform, and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories, and can be used both internally and externally.


PforzheimSingle mast aluminum alloy lifting platformManufacturing process analysis



Now with the arrival of summer, the aluminum alloy lifting platform will certainly suffer from high temperature and rainstorm in summer. It is easy to rust after a long time under this condition, which will seriously shorten the service life of the equipment and cause safety problems. So how should we prevent equipment rust?

technological innovation.The selection of vibration pickup points refers to the placement point of the sensor, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.

The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit mainly consists of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation,PforzheimRail-type lift platform , all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity, and the lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage until it rises 1m above the ground or detaches from the ground buffer spring (or support), the adjustment and sequence are as follows: 1. Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to maintain the installation surface of the mechanism perpendicular to the horizontal plane, and make the upper and lower pendulum wheels evenly guide the rails at the same time. Rotate each wheel body by hand to check if it evenly presses the rails; 2. Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to 0.2; Between 0.5mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of 0.2-0.5 ram with the guide rail; 4. Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune 6 pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in 1 appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than 85% of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.

Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.

Pforzheim.The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.

The design of support points for selecting process parameters is to avoid energy consumption and noise generation due to collision between components and supports during vibration. The supports should be arranged near the nodal line, and the layout principle is: when the aspect ratio of the component is greater than 2, two point supports can be used; When the aspect ratio is close to 1, it is advisable to use or 4-point support.

The safety control voltage of 18 is selected with rolling guide shoes, high accuracy, wear resistance, and stable lifting. The characteristics of the Jinchuang lifting platform are as follows: 1. There is no need for a machine room above the shaft. 2. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. 3. The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirements of the shaft are low, Brick or brick concrete structure hoistway can be used for Jinchuang lifting platform safety and stability advantages. Overflow valve: It can prevent system pressure from being too high during upward movement. Emergency manual valve: In case of power failure, it can make the elevator emergency descend to the nearest floor position and open the door.