Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

Hui Cen.The inner bearing of the roller in the device is in good condition, suitable for both indoor and outdoor installation.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.


Hui CenRechargeable electric elevatorClassification and function



Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Precautions during operation: Mechanical operations should be gentle and smooth, and mechanical operations should be avoided, otherwise impact loads will inevitably occur, causing frequent mechanical failures and greatly shortening the service life. Generated during homework

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Administration.Spiral electric lifting mechanism: With all the functions of a regular lifting platform, also known as a hydraulic lock a hydraulic control one-way valve is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Professional is king.The net height of the landing door opening should not be less than 8m,Hui CenTwo phase electric elevator, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

During maintenance or when problems occur,Hui CenElectric hydraulic platform elevator, the power supply should be cut off in a timely manner. After lifting, the aluminum alloy electric elevator should be firmly fixed before maintenance can be carried out. It is strictly prohibited to operate with defects to avoid accidents.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Hui Cen.The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, the lifting platform platform platform that carries the load needs to be balanced,Hui CenElectric elevator, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.