KrasnodarHollow aluminum pipeWhat are the reasons for the wrong side

announcer:hp535HP136858825 release time:2024-02-11 12:02:25

However, for some important parts, it is also considered that the yield ratio should be smaller to improve their safety and reliability. However, at this time, the utilization rate of materials is also low. Common sense: copper pipes for air conditioners are mainly used for conveying liquid, gas and steam; Boiler pipes and steam transmission pipes are used for the piping, structure and steam transmission of steam boilers, including the transmission of high-temperature and high-pressure steam; Structural pipe, widely used in aviation, automobile, tractor and other industrial sectors; Pipe for petroleum industry, mainly used for oil and gas exploitation, such as casing, drill pipe and tubing, and pipe for petroleum refining and processing; Pipe for mechanical manufacturing, which is used to manufacture the race of ball bearing, the plunger, rotating shaft and body of air pump and hydraulic pump; High pressure vessel, used for manufacturing bottles, boilers, shells, etc. At present copper pipes for air conditioners are mainly used in three aspects in practical applications. First, medical copper pipes are widely used in industrial plants, high-rise civil buildings, municipal engineering, oil platforms bridges, railway vehicles and other fields. Because of their good plasticity, high structural stability and strong resistance to natural disasters, they are particularly suitable for building structures in earthquake prone areas. Second, the air conditioning copper pipe has high tensile strength and toughness, high buildings, bridges and other steel structures have good cold bending performance and welding performance, so it is widely used in vehicle manufacturing, large bridge construction, mechanical manufacturing, industrial plant components and many other industries. Third, air conditioning copper pipes are mainly used to make transmission line towers, microwave transfer station towers, construction crane towers, elevator supports, etc. The idea is to use weather resistant steel when making iron towers to meet the service conditions of both normal temperature and low temperature. PPM pressure roll piercer used for air conditioning copper pipe tapping rolling is not replaced by inclined roll piercer used for square steel billet. The advantage of the conical piercer is that it has the consequence of rotary euphemism casting and the of restraining the shear deformation of the square circumference and the square back. Therefore,Krasnodar316L stainless steel round steel, it can prevent the defects outside the steel pipe. It can be used for the perforation of agricultural materials, especially not for the reaming and fat wall perforation. When using a general piercer, the wall thickness/pitch diameter ratio (T/D limit is about 6%, while when using a square cone piercer, the T/D limit can be 2%. Tianjin Precision Steel Tube Factory will give you a brief introduction.

Attention shall be paid to the purchase of red copper pipe in order to study the distribution law of pipeline crack stress field under internal pressure. The simulation ysis and experimental verification are carried out for pipes with cracks of different shapes, different directions, different internal pressures and different sizes. The results show that the stress at the crack tip is much greater than that at the crack center. The crack shape has little effect on the stress. With the increase of the included angle between the crack direction and the pipe axis, the stress at the crack tip first increases and then decreases. With the increase of the pipe internal pressure, crack depth, the stress at the crack tip increases linearly. Among them, the effect of crack length on the stress at the crack tip is smaller than that of internal pressure and crack depth. During the construction and operation of long-distance pipeline, due to the influence of pipe manufacturing defects, welding defects, internal and external loads, stress concentration, corrosion defects and other factors, the pipeline will produce cracks and expand cracks, which is the most dangerous defect of long-distance pipeline and the main reason for pipeline failure. At present, pipeline cracks are mainly determined by internal testing and non-destructive testing after excavation. Among them, ultrasonic internal testing has a good identification rate for cracks with a length of more than 25 mm, a depth of more than 1 mm in the base metal or a depth of more than 2 mm in the weld; Magnetic flux leakage internal detection has a certain detection rate for cracks with opening more than 0.25mm, but it is difficult to identify and quantify. In NDT, magnetic particle, penetration, eddy current and radiographic methods have high detection and identification rate. The generation and propagation of cracks will cause local stress concentration in the pipeline, which is prone to brittle fracture, fatigue damage, corrosion damage and other failure phenomena, seriously affecting the service performance and reliability of long-distance pipeline. In this paper, the influence of crack shape, direction and size on the stress at the crack tip is yzed by studying the stress field distribution law of copper pipe cracks, which provides a reference for the prevention and control of pipe cracks. What problems will be encountered in the production of copper tubes. The production of copper pipe includes four steps: welding, forming, inspection and pipe expansion.

Krasnodar.Disadvantages: low output, high production cost and high price. Extrusion copper tube process is a stable and excellent copper tube production method at home and abroad at present. Only the copper tubes produced by this process are more suitable for the field of heating and ventilation, which is the development direction of copper tube industry in the future.

Now let me talk about the damages that are easy to occur on the surface of the copper tube. In order to prevent the accumulation of process agents or products and/or dirt, scratches and other rough surfaces, mechanical cleaning must be carried out. If the copper pipe is heated to a certain high temperature in the air during welding or grinding, chromium oxide heat return color will appear on both sides, lower surface and bottom of the weld. The color after tempering is thinner than that of the oxidation protective film, and is clearly visible. The color depends on the thickness. The thicker oxide can be found in the rainbow color, blue, purple to brown. It is usually black. It is caused by being at high temperature or being at high temperature for a long time. When any of these oxide layers exist, the chromium content on the metal surface will, and the corrosion resistance of these areas will. In this case, it is not only necessary to heat temper the color and other oxide layers, but also to clean the chromium poor metal layer under it. Free iron on the surface of t2 copper tube will rust, causing corrosion of stainless steel. Therefore, the powder that must float can usually be removed together with the dust. Some are very sticky and must be treated as embedded iron. In addition to dust, there are many surface iron sources, glass beads or other abrasives previously used on ordinary carbon steel, low alloy steel or cast iron, or regrinding non stainless steel products attached to copper pipe components and equipment. If there is no protection during cutting or hoisting, the wire ropes, slings and iron on the working surface can easily be embedded or dirty the surface. The copper tube shall be boiled in boiling water for 30 seconds before cold treatment. The effective internal stress is about 15%, and the residual austenite reaches the effect. Then, the cold treatment can be carried out as usual. Of course, the second suggestion is to choose the normal treatment at minus 60 degrees, and then conduct deep cooling at minus 120 degrees. The lower the treatment temperature is, the retained austenite will be rapidly transformed into martensite, it can be found that there will be about 2% of retained austenite. At this time, retained retained austenite can achieve a certain buffer effect. After cold treatment, which can effectively heat about 40% of the cold treatment stress. Tempering and cold treatment should be carried out as soon as possible after gradual heating, and most of them can avoid cracks as soon as possible, so as to ensure that the products will not deform in later use and facilitate daily storage. The transformation characteristics of the area of each layer of the copper tube during empty drawing affect the asymmetry of the deformation of the metal material. One of its characteristics is that the natural widening of each layer along the wall thickness is not consistent. Of course, the external layer of the copper tube is less, and the natural widening of the middle layers is slow from the external layer to the internal surface layer.The technical level of degreasing copper tube for mechanical equipment With the substantial improvement of the manufacturing level of mechanical equipment and the degree of control automation in China, there is still some gap between the technical level of domestic degreasing copper tube production line and the products of foreign counterparts. After years of reform and opening up. The quality of all aspects of degreased copper pipe has also risen by several grades, significantly narrowing the quality gap with the imported production line. The aluminum hose production line and aluminum can production line developed and produced by the company break the technological monopoly of foreign companies, can provide stable and reliable production equipment for domestic and international markets and make great contributions to the aluminum packaging industry. With the continuous improvement of people's living standards, there will be more and more demand for degreased copper tube products, and its market potential is huge. Problems such as incomplete penetration, deformation, cracks and air holes are easy to occur during the fusion welding of degreased copper tubes. Compared with fusion welding, wood is not melted during brazing, which reduces the impact of large thermal conductivity of base metal on welding quality, prevents the formation of incomplete penetration, reduces the tendency to produce pores and cracks, and ensures the performance of weld. Because the base metal is not melted, the structure and properties of the base metal are almost unchanged, so that the original service properties of the base metal can be maintained.

.At the same time, it is also a necessary equipment in the family. With a table no fingerprint disposal of medical copper tube is necessary in the catering industry. Only when you cook food can you have a place to enjoy it.

Pay attention to the following points when using flame heating brazing: the selection of welding materials The filler metal is wire or rod, with a diameter of about 35mm. The material is: the melting temperature of wire 221 is about 0905 ℃. Its chemical composition is FB10 The composition is 2331% H3BO3 and 6071% KBF The joint form of brazed copper pipe is mostly plug-in. Before cleaning the brazed copper pipe before welding, the edge of the pipe mouth must be corrected and deburred to ensure that the pipe mouth is free of cracks or other defects. And clean the surface of the inserted part. After the red copper pipe is assembled by tack welding, it shall be fixed by tack welding. The number, size and height of tack welds shall be symmetrically and evenly distributed along the circumference from top to bottom, left to right, and the tack welds shall be melted into the whole weld during brazing. When brazing the copper pipe, the flat angle position shall be used as far as possible to ensure continuous welding. Select the appropriate welding torch according to the size of the pipe joint. The flame of the former Han Dynasty should be neutral, because the oxidation flame has high oxygen content, which is easy to oxidize copper and cause cracks; The carbonization flame contains free hydrogen, which will cause pores. When heating pipes before welding, the flame shall be perpendicular to the heating surface the pipe joints shall be heated evenly, and the base metal shall be heated as quickly as possible to avoid excessive temperature and heating time of the through pipe joints. During the brazing of degreased copper tube, the brazing seam and filler metal shall be under the protection of flame. In addition, it shall be noted that the brazing seam shall be naturally cooled after welding, and the weldment shall not be moved before the brazing seam has solidified. After natural cooling after welding, hot water or wet cloth shall be used to wipe the brazing seam and remove welding slag to improve corrosion resistance and reliability of post welding inspection.

The process flow of plastic coated copper pipe: the settlement price of 904l stainless steel plate is on the high side, and the price is stable. 904l stainless steel plate: last Friday, the steel plant made all the orders. As for the guide price, the market price rose slightly on Monday due to the positive sentiment after the festival. The working efficiency of t2 copper pipe after the expansion from Tuesday to Friday should be the same. Between the upper and lower clamping groove bodies of the alloy pipe to be flared, the end of the alloy pipe to be flared faces the flaring die, extends a certain length (depending on the flaring length), and then drives the upper clamping groove body to move down through the oil cylinder. Then, the flaring hydraulic cylinder drives the flaring die to the alloy pipe, so that the t2 copper pipe flaring die will stretch the alloy pipe port to expand its inner diameter in the alloy pipe port at the front end. The length of flared section can be 20200 mm. How to solve the crack of plastic coated copper pipe? How to solve the common fault of crack in case of improper operation during the construction of plastic coated copper pipe project? If it is not handled in time, there is a serious risk. Therefore, find more practical welding processes and then ensure the welding quality of electric welding. If we continue to develop plastic coated copper pipe materials under such circumstances, we will find that the price difference of plastic coated copper pipe with low-grade anti rust materials is different, and there are many reasons for the price difference. First, there are significant differences in production. Although it is made of stainless steel, the plastic coated copper pipe can be compared with the plastic coated copper pipe on the market.


KrasnodarHollow aluminum pipeWhat are the reasons for the wrong side



Plastic coated copper pipe is a kind of non-metallic material pipe with light weight, high strength and corrosion resistance. The plastic coated copper pipe is made of glass fiber with resin base weight which is wound on the rotating hollow floor step by step according to the processing technology regulations, and the stone sand is laid on the ground evenly for a long distance in the middle of the chemical fiber as the intermediate weathering layer. The price quotations of plastic coated copper pipes with different thicknesses are also different. Here, we will explain the factors that determine the thickness of the plastic coated copper pipe design scheme. Appearance and specification of mpp cable duct 1 Color: generally orange red, other colors can be implemented according to the contract of both parties. 2 Appearance quality: The inner and outer walls of the pipe fittings shall be smooth, clean and even, and shall be free of steam bubbles, cracks, cracks, molting, and obvious marks, dents, residues, dissolved discoloration lines and uneven colors. The inner holes of the pipe shall be laser cut and leveled and vertical to the pipe centerline. The inner holes shall be smooth and free of burrs. Specification: The length of pipe fittings is generally 6000 or 9000mm, which can also be negotiated by both parties. The specification error shall conform to dl/t801; The bending degree of the hose shall not exceed 1% of the nominal pressure. Some key points in the process of embedding plastic coated copper pipe: the embedding process of plastic coated copper pipe is very worthy of great attention. Although the actual operation in the process of embedding is relatively simple, there may be many key points. Pay special attention to the leveling and straightness of the road surface when threading, In other words, if the road surface is seriously uneven, it is seriously affected by external forces. Relevant countermeasures must be taken, and fine sand and dirt should also be prohibited from seeping into the pipe during the burial process, so as to diligently maintain its compliance with the regulations during the burial process. The process of embedding the plastic coated copper pipe involves the problem of marking. In fact, it is only necessary to find matching marks for immediate maintenance. Number of layers of cloth stacking: all layers are made strictly according to the design scheme, without additional construction, which increases the cost. 2 Resin: high temperature resistance, not easy to deform under stress. Plastic coated copper pipes are generally assembled from high-quality SMC water tank plates. Its characteristic is that it can select food grade stainless steel resin. Therefore, in view of the good water body, clean up the natural environment and zero pollution, the commodity development trend has certain characteristics such as high compressive strength light weight, beautiful and generous appearance design scheme corrosion resistance, long service life, and more convenient management methods in maintenance. Cloth quality: the specification of cloth surface is the same, pure platinum cloth is thick, and it is thick with blended cloth or pure old coarse cloth. The thickness of fiberglass filament winding: our products are high-tech support points of fiberglass anti-corrosion ring, which ensures the bearing pressure of the products. In addition, if you must select the thickened type, you can yze the vertical cross type difficult winding when winding the winding machine until the thickness and compressive strength of the thickened type are basically achieved.

The lipophilic group of surfactants can help to dissolve oil in water to realize degreasing. 2 Alkali degreasing: Alkali degreasing is a complex chemical physical process. In addition to saponification reaction, there are sometimes emulsion reaction and adsorption reaction. Typical saponification reaction formula is as follows: R2COOH+NaOHR2COONa+H2O At present, industrial degreasers are composite reagents, and the solution temperature is 6070 ℃. 3 Ultrasonic degreasing: ultrasonic degreasing is to degrease the upper and lower surfaces of red copper pipes by using ultrasonic to generate high-speed vibration, which is mostly used for monomer and irregular shaped components. 4 High pressure hot water degreasing: without degreasing agent, heat the deionized water to 7080 ℃, and spray it directly to the surface of red copper pipe for cleaning under the pressure of about 40bar. Electrolytic degreasing: electrolytic degreasing, using the red copper tube as the cathode to generate H2, which will scour the oil stain on the surface of the red copper tube; The O2 generated by the anode is in atomic state and has strong oxidation capacity, which can improve the degreasing effect. Therefore, the problem that alkali spraying and brushing cannot fully contact the micro concave part of the surface is solved. Generally, the cleaning effect of alkali degreaser spraying or high-pressure hot water degreasing plus brushing can meet the requirements of most users. If there are special requirements, multiple methods can be used together. According to practical experience, the degreasing effect of various degreasing methods (one side of the copper tube) is as follows: alkali degreaser spray plus brushing: 46mg/m2 alkali degreaser brushing plus electrolytic degreasing: 13mg/m2 ultrasonic wave: 24mg/m2 high-pressure hot water degreasing:<5mg/m2 degreasing copper tube What is the degreasing purpose of the degreasing copper tube? The purpose of degreasing is to provide a clean surface for the copper pipe and lay a foundation for the subsequent process of coating. What is degreased copper tube? &We learned about the cleaning degree detection method of degreased copper tube: Visual inspection. Wet the degreased workpiece surface with water, the degreasing effect is good. 3 Copper sulfate method. This method is divided into copper sulfate immersion method and copper sulfate dropping method. The copper sulfate immersion method is to immerse the degreased workpiece in the acidic copper sulfate aqueous solution, take the workpiece out of the solution after 1 min, and wash it with water. Degreasing red copper pipe shall be evaluated for cleanliness according to the copper film. The copper film is complete and uniform, with good luster and adhesion, indicating that there is no oil stain on the surface of the workpiece. This method is suitable for small workpieces.

One of the classification of copper tubes. The common wave shape is a single copper tube. Hyperbolic means that two different arcs overlap on the same surface, that is, starting from different circle centers, draw arcs in two radii. The red copper tube is a module made of double curves designed according to the drawings. The red copper tube is light in weight, good in rigidity and high in strength. The shapes of the red copper tubes processed are different and can be processed into various geometric shapes such as arcs and spheres. It is beautiful, then heat it, then place it on the mold prepared in advance, then slowly beat it with a hammer, finally cut,KrasnodarHollow aluminum pipe,KrasnodarTinned copper bar, fold, it can be considered to break it into small pieces for forming, and then splice it into large pieces. For such copper pipes, the cost is high and the production period is long. 2 Forming method of roll bending This method is to make some modifications on the roll bending machine, and change one of the shafts into a concave type and the other into a convex type. This method can form a regular copper tube like a sphere, with a small processing range, but it has great advantages for copper tubes with small radians. What problems should be paid attention to when designing the hyperboloid copper tube? Everyone knows that the design of the air conditioning copper tube is very important. To achieve the beautiful shape, exquisite workmanship and fashionable personality of the hyperboloid copper tube, first of all, the design is very critical. Some small copper tube companies are not mature enough in design and have not enough design experience, so they often have problems in design, Hyperbolic copper tube is very famous for preparing some details that we should pay attention to in the design. The sculpted copper tube is highly decorative, and the production and processing technology of hyperbolic shaped copper tube is relatively complex. Copper tube products with strong aesthetics. According to the design requirements, different shapes need to be molded for the sculpted copper tube, so the production process of sculpted aluminum veneer is relatively complex.

demand.The surface coating of medical copper tube is very important. Observe its thickness, how to prevent the aging of medical copper tube? How to select the foam density of medical copper tube Good medical copper tube and foam density are very high and hard. Check the quality of aluminum zinc coated color steel plate on the surface. As exterior wall thermal insulation decorative plate. Then use your hand to break it up and down to see if it is easy to deform. If you break it with force, it will deform, which is not good. 3 See the price.

It is applicable to the removal of thin liquid oil stain and light rust and the generation of phosphating film with certain corrosion resistance. See Table 3 for example of formula and operating conditions. Table 3 Degreasing, rust removal, phosphating and passivation

What problems should we pay attention to in each production. It is a key process to weld copper pipe with correct process. Welding materials, welding voltage welding current wire arrangement, spacing, which integrates cone die tube expansion which is processed into seamless square pipe. The physical properties of copper tubes are slightly weaker than those of hot-rolled steel tubes. The copper tube adopts a two-step push tube expanding machine, data medium frequency induction heating and hydraulic press. With effective processing technology, low energy consumption, less infrastructure construction, and what are the production batches suitable for copper tube testing. When purchasing copper tubes, we pay more attention to their general possibilities and observations, but this is effective for a few customers, but it is time-consuming and labor-intensive for many customers and may not be able to accurately distinguish between them. For such problems, and then the following is how to conduct inspections. The dimension tolerance of the cleanliness and wall thickness of the inner cavity of the copper tube is strict. However it is recommended to conduct a large number of inspections within a small scope of procurement, in the whole process of electric welding, due to the role of the molten metal material of the air conditioning copper pipe, the thickness of the pipe at the welding point will be uneven, and the inside and outside of the welding will be uneven. This will cause energy consumption of the conveyor. At this time, the internal welding ground must be used for leveling. Next we will take you to the production process of copper pipe - internal welding and calibration. At present, many materials are also used in the life of red copper pipes. Be as judgmental as possible when buying. In fact, there are many things to pay attention to when purchasing copper tubes. Want to keep high when buying. What should we pay attention to when buying copper tubes next. The daily use and market are calculated according to the weight, so you should decide how much to use before buying.


KrasnodarHollow aluminum pipeWhat are the reasons for the wrong side



When cutting the copper pipe of air conditioner, use tools such as clamps to fix the copper bar and then cut it, rather than fixing it by hand, to prevent shaking and resulting in irregular cutting. 3 After the cutting of the air conditioner copper pipe is completed, the cut parts need to be placed in a dry place, and then processed again after cooling, otherwise oxidation will occur due to high temperature. Liu Shuchen, director of the Resource Analysis Office of the Information Center of the Ministry of Land and Resources, said that copper bar manufacturers are currently in a period of adjustment in China's mining industry as a whole. In the long run, the mining super cycle driven by China's demand has not changed, especially the growth rate of the country's economy. After the global economy may improve in the second half of the year, the global mining industry will rise again, and the W-shaped trend will fully emerge. In the second half of the year, there were signs of stabilizing and rebounding. In terms of the macro factors affecting the bulk commodities, the factors affecting the European market of tinned copper bars have gradually weakened, and the economic conditions of China and the United States have become the key factors affecting the bulk commodities. The European economic recession is a foregone conclusion, and the possibility of a crisis in the next period of time is also reduced. In recent years, the American market economy has shown the characteristics of better than expected in the first quarter and weaker than expected in the second quarter. Since January, the global price of medical copper tubes has gradually got rid of the main tone of this year's shock and decline. &Air conditioning copper tubes show signs of stabilizing and rebounding. The three-month copper on the London Metal Exchange once rebounded nearly 7% from the year's low point, and the market price has rebounded to around 7600 dollars per ton. Driven by this, products including aluminum, zinc and other products have also rebounded. Only nickel, a basic metal product, has remained weak.

Fair price.What problems should we pay attention to in each production. It is a key process to weld copper pipe with correct process. Welding materials, welding speed of t2 copper pipe, welding current, welding voltage, wire arrangement, which is processed into seamless square pipe. The physical properties of copper tubes are slightly weaker than those of hot-rolled steel tubes. The copper tube adopts a two-step push tube expanding machine which integrates cone die tube expansion, data medium frequency induction heating and hydraulic press. With effective processing technology low energy consumption, less infrastructure construction, good products, wide application fields of raw materials and products, and what are the production batches suitable for copper tube testing. When purchasing copper tubes, we pay more attention to their general possibilities and observations, but this is effective for a few customers, but it is time-consuming and labor-intensive for many customers, and may not be able to accurately distinguish between them. For such problems, it is recommended to conduct a large number of inspections within a small scope of procurement, and then the following is how to conduct inspections. The dimension tolerance of the cleanliness and wall thickness of the inner cavity of the copper tube is strict. However, in the whole process of electric welding, due to the role of the molten metal material of the air conditioning copper pipe, the thickness of the pipe at the welding point will be uneven, and the inside and outside of the welding will be uneven. This will cause energy consumption of the conveyor. At this time, the internal welding ground must be used for leveling. Next, we will take you to the production process of copper pipe - internal welding and calibration. At present, many materials are also used in the life of red copper pipes. Be as judgmental as possible when buying. In fact, there are many things to pay attention to when purchasing copper tubes. Want to keep high when buying. What should we pay attention to when buying copper tubes next. The daily use and market are calculated according to the weight, so you should decide how much to use before buying.

Advantages of red copper tube Durability: copper has stable chemical properties, integrating cold resistance, heat resistance, pressure resistance, corrosion resistance and fire resistance, and can be used in different environments for a long time.

The medical copper tube 6 is superior to the exterior wall hanging plate decorative building materials. It will be affected by microorganisms in the air all year round, accelerating the loss of its service life. 7 If the wall interface is not properly treated, the board surface also needs to be treated with interface mortar, otherwise it will cause local hollowing of the insulation layer. How to protect the medical copper tube during installation? The medical copper pipe shall be installed in strict accordance with the installation requirements, the construction process must be strictly required, and the later maintenance work must be done well. 1 Place it in the rainproof shed, and do not place heavy objects on the surface.

Krasnodar.The process flow of plastic coated copper pipe: the settlement price of 904l stainless steel plate is on the high side, and the price is stable. 904l stainless steel plate: last Friday the steel plant made all the orders. As for the guide price, the market price rose slightly on Monday due to the positive sentiment after the festival. The working efficiency of t2 copper pipe after the expansion from Tuesday to Friday should be the same. Between the upper and lower clamping groove bodies of the alloy pipe to be flared, the end of the alloy pipe to be flared faces the flaring die, extends a certain length (depending on the flaring length), and then drives the upper clamping groove body to move down through the oil cylinder. Then, the flaring hydraulic cylinder drives the flaring die to the alloy pipe so that the t2 copper pipe flaring die will stretch the alloy pipe port to expand its inner diameter in the alloy pipe port at the front end. The length of flared section can be 20200 mm. How to solve the crack of plastic coated copper pipe? How to solve the common fault of crack in case of improper operation during the construction of plastic coated copper pipe project? If it is not handled in time, there is a serious risk. Therefore, I will carry out practical operations in strict accordance with the engineering construction specifications and requirements related to immediacy, find more practical welding processes and then ensure the welding quality of electric welding. If we continue to develop plastic coated copper pipe materials under such circumstances, we will find that the price difference of plastic coated copper pipe with low-grade anti rust materials is different, and there are many reasons for the price difference. First, there are significant differences in production. Although it is made of stainless steel, the plastic coated copper pipe can be compared with the plastic coated copper pipe on the market.

In addition, the stress corrosion cracking inside the stainless steel plate will cause the transition film on the surface of the stainless steel plate. Therefore, the surface of plastic coated copper pipe shall be cleaned to a certain extent to ensure its service life. The oil cracking tube circuit breaker must be selected. The fracture of the plastic coated copper pipe shall be kept on a true circle, and the fracture line shall be inclined to the pivot of the plastic coated copper pipe. Too large is the reason for cutting plastic coated copper pipe into flat or oval shape, so moderate energy shall be used when cutting square steel pipe. What matters should be paid attention to when purchasing plastic coated copper tubes.

Attention shall be paid to the purchase of red copper pipe in order to study the distribution law of pipeline crack stress field under internal pressure. The simulation ysis and experimental verification are carried out for pipes with cracks of different shapes, different directions, different internal pressures and different sizes. The results show that the stress at the crack tip is much greater than that at the crack center. The crack shape has little effect on the stress. With the increase of the included angle between the crack direction and the pipe axis, the stress at the crack tip first increases and then decreases. With the increase of the pipe internal pressure, crack depth, and crack length, the stress at the crack tip increases linearly. Among them, the effect of crack length on the stress at the crack tip is smaller than that of internal pressure and crack depth. During the construction and operation of long-distance pipeline, due to the influence of pipe manufacturing defects, welding defects, internal and external loads, stress concentration, corrosion defects and other factors, the pipeline will produce cracks and expand cracks, which is the most dangerous defect of long-distance pipeline and the main reason for pipeline failure. At present, pipeline cracks are mainly determined by internal testing and non-destructive testing after excavation. Among them, ultrasonic internal testing has a good identification rate for cracks with a length of more than 25 mm, a depth of more than 1 mm in the base metal or a depth of more than 2 mm in the weld; Magnetic flux leakage internal detection has a certain detection rate for cracks with opening more than 0.25mm, but it is difficult to identify and quantify. In NDT, penetration, eddy current and radiographic methods have high detection and identification rate. The generation and propagation of cracks will cause local stress concentration in the pipeline, which is prone to brittle fracture, fatigue damage, corrosion damage and other failure phenomena, seriously affecting the service performance and reliability of long-distance pipeline. In this paper, the influence of crack shape, which provides a reference for the prevention and control of pipe cracks. What problems will be encountered in the production of copper tubes. The production of copper pipe includes four steps: welding, forming, inspection and pipe expansion.