Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece,Bohong tribeAluminum alloy hydraulic lifting platform, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, so the excitation force is selected as the fourth gear.

According to GB/T25712-2010, when one of the following situations occurs in the curve related to the aging frequency, it can be determined that the area covered by the effective zone of the vibration mode at that frequency has reached the aging effect: the curve rises and flattens; The curve rises, then falls, and then flattens; The resonance frequency of the a-n curve after vibration is lower than that before vibration; The bandwidth of the a-n curve after vibration narrows compared to before vibration; The resonance peak of the a-n curve after vibration exhibits fission phenomenon; The curve flattens out after descent.

Bohong tribe.Check the oil level of the gearbox and make up for new oil if necessary

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

.The arrangement of vibration points should be based on the vibration aging process standard GB/T25712-20. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.

Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.


Bohong tribeLarge fixed lifting platformQuality Control



Emergency stop: Press the emergency button switch to raise or lower the machine.

The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit mainly consists of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity, and the lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage until it rises 1m above the ground or detaches from the ground buffer spring (or support), the adjustment and sequence are as follows: 1. Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to maintain the installation surface of the mechanism perpendicular to the horizontal plane, and make the upper and lower pendulum wheels evenly guide the rails at the same time. Rotate each wheel body by hand to check if it evenly presses the rails; 2. Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to 0.2; Between 0.5mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of 0.2-0.5 ram with the guide rail; 4. Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune 6 pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in 1 appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than 85% of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

Where can I find it?.During aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy12 drivers must carefully check the electrical, hydraulic, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

Thermal aging stress relief is generally suitable for small workpieces while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore so neither of these two methods is feasible. After research and understanding by the manufacturer, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

Firstly, it is necessary to start from the source. The current technology is relatively advanced. When manufacturing aluminum alloy lifting platforms, adding chromium, nickel, etc. to ordinary steel to make stainless steel, changing the internal structure of the metal to prevent rust.


Bohong tribeLarge fixed lifting platformQuality Control



When the lifting base plate descends, the safety net below immediately stops running and descends when encountering obstacles.

safety requirements .The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.

The surface of each part of the brush should be kept clean and the brush pressure should be adjusted to ensure that its area is not less than 50%.

Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, is convenient for maintenance, and has a long service life. In case of a power outage,Bohong tribeSelf propelled curved arm lifting platform, manual emergency descent can be used,Bohong tribeMobile boarding bridge manufacturer, which is safe, convenient, and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, visual display of the position of the elevator car on the floor, with automatic and manual options.

Bohong tribe.Thermal aging stress relief is generally suitable for small workpieces, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, is convenient for maintenance, and has a long service life. In case of a power outage, which is safe, convenient fast, and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, easy operation, visual display of the position of the elevator car on the floor, wiring harness connected using connectors, with automatic and manual options.