BotanzaCustomization of electric elevatorsProduct selection

announcer:hp323HP155335083 release time:2023-12-23 11:02:14

Teach you how to choose elevator cables. When choosing elevator cables, you should follow the following two principles: good electrical parameters; During the movement of the cable with the elevator, causing changes in electrical parameters such as impedance and distributed capacitance of the cable. Poor quality cables have significant parameter changes when subjected to force deformation,

Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten the inner hexagon. Afterwards, remove the motor shaft key.

Botanza.The double column aluminum alloy lifting platform is designed with beautiful and generous appearance,BotanzaConstruction site elevator, usually ranging from 6-14 meters in height, and can carry a load of 150-300 kilograms. Large countertop design allows for one to two people to work simultaneously.

Single column aluminum alloy elevator with easily recognizable operation panel, multiple mechanical, electrical and hydraulic safety protection, and advanced integrated hydraulic electricity

.Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform force, please first screw on the installation bolts at any diagonal position, but do not tighten them. Then, screw on the installation bolts at the other two diagonal positions and tighten the four installation bolts one by one. Afterwards, tighten the tightening bolts. All tightening bolts require torque wrenches to be fixed and inspected according to the indicated fixed torque data. Elevators and lifting platforms are widely used special equipment for high-altitude operations. Its scissor fork mechanical layout ensures high stability after the elevator is lifted, with a wide operating range and high load-bearing capacity, making high-altitude operations increasingly large-scale and supporting multiple people working together. It makes high-altitude operations more powerful and safe. It is a widely used specialized equipment for high-altitude operations.

Teach you how to choose elevator cables. When choosing elevator cables, you should follow the following two principles: good electrical parameters; During the movement of the cable with the elevator, there will be a section in the middle that undergoes bending deformation due to gravity, causing changes in electrical parameters such as impedance and distributed capacitance of the cable. Poor quality cables have significant parameter changes when subjected to force deformation

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.


BotanzaCustomization of electric elevatorsProduct selection



Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

Regularly check for water accumulation and humidity. It is inevitable for high-altitude work vehicles to drive in rainy and snowy weather, or muddy roads. The bottom and some gaps, as well as the indoor floor, are prone to accumulation of sludge. If the owner does not clean them in a timely manner, this will cause moisture to hide. Therefore, the outer edges of the wheel hub, bottom corners of tree trunks, keyholes and wiper brackets, and the drainage holes of the doors and various parts should be kept unobstructed to ensure that the car seat covers such as humidity, carpets, and floors, prevent rusting of accessories.

During the use of hydraulic elevators, if not properly operated, there will always be problems. Many customers have reported that hydraulic elevators sometimes cannot be lifted. If the hydraulic lift pump can continue to work, other issues need to be considered. Below, the editor will explain the reasons for the hydraulic lift pump station not being oiled and solve the reasons for the hydraulic lift pump station not being oiled, and the motor often closes the valve and loses power when powered on.

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

Fixed boarding bridge: A fixed boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles to move and batch goods inside the truck


BotanzaCustomization of electric elevatorsProduct selection



When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.

recommend.Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranked outriggers, and pull-out outriggers. Professional elevator manufacturer with large quantity and excellent quality at a reasonable price. Fire resistant, waterproof, high temperature resistant,Botanza15 meter elevator, sturdy and durable, safe and reliable

Ensure excellent power supply at the installation site, install a separate distribution box, and the electrical leakage switch must meet the requirements for construction elevators when using the distribution box. If the installed construction elevator is variable frequency, the leakage switch should be compatible with the frequency converter when selecting it.

The normally closed valve and motor are energized simultaneously; The solution is correct wiring, and the motor often closes the valve and loses power when powered on.

Botanza.Systems: explosion-proof electronic control system, remote control system,BotanzaLifting platform, and PIC system. Professional elevator manufacturers have stable, safe, reliable performance, and can achieve maintenance free. Their technical level has reached the domestic level and reached the advanced level of similar international products

Drain all the hydraulic oil in the oil tank, open the oil tank, take out the oil suction filter, clean it, and return it to the oil tank. Install it in its original position. Fill the fuel tank with new oil.

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.